ESC07-00705
| Site Final | 8/19/2008 | 8/19/2008 | 8/19/2008 5:42:11 PM | P | PASS |
|
|
re veg in place
|
BLD07-01436
| BLD-Final | 8/19/2008 | 8/19/2008 | 8/19/2008 5:40:34 PM | P | FAIL |
|
|
BRAD Phone #: ###-#### c/n posted,, need zoning, address
|
ESC08-00669
| Site Preparation | 8/19/2008 | 8/19/2008 | 8/19/2008 5:37:24 PM | P | PASS |
|
|
|
ESC08-00203
| Random Inspection | 8/19/2008 | 8/19/2008 | 8/19/2008 5:33:10 PM | P | PASS |
|
|
|
BLD08-01663
| BLD-Footing | 8/19/2008 | 8/19/2008 | 8/19/2008 5:31:51 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/19/2008 at 6:42:47 AM. Contact: ###-####.
|
ESC08-00203
| Site Final | 8/19/2008 | 8/19/2008 | 8/19/2008 4:18:07 PM | P | PASS |
|
|
call Clint ###-####
|
BLD08-00539
| BLD-Final | 8/19/2008 | 8/19/2008 | 8/19/2008 4:11:58 PM | P | PASS |
|
|
toli Phone #: ###-####
|
BLD08-00539
| DOC - Permit Finaled | 8/19/2008 | 8/19/2008 | 8/19/2008 4:11:52 PM | P | PASS |
|
|
|
ESC08-00423
| Site Final | 8/19/2008 | 8/19/2008 | 8/19/2008 3:21:19 PM | P | PASS |
|
|
|
BLD08-00991
| BLD-Final | 8/19/2008 | 8/19/2008 | 8/19/2008 3:07:01 PM | P | FAIL |
|
|
STEVE Phone #: ###-#### nOTE; PLEASE CALL 1/2 HR PRIOR TO INSPECTION need steps to garage and handrails up stairs per code
|
BLD08-01234
| BLD-Energy code compliance | 8/18/2008 | 8/19/2008 | 8/19/2008 2:41:00 PM | P | PASS |
|
|
ernie Phone #: ###-####
|
BLD08-00955
| BLD-Other | 8/18/2008 | 8/19/2008 | 8/19/2008 1:46:12 PM | P | NR |
|
|
rob Note: ceiling cover Phone #: ###-#### need trades 1st
|
BLD07-02917
| BLD-Conference | 8/19/2008 | 8/19/2008 | 8/19/2008 12:40:35 PM | A | NR |
|
|
find status of job per 415
|
BLD07-03106
| BLD-Framing/Rough-in | 8/18/2008 | 8/19/2008 | 8/19/2008 12:22:13 PM | A | PART |
|
|
Den Phone #: ###-#### conf only,, need a mech permit for fans,, then at least bath rooms would be ok to cover
|