BLD08-00177
| BLD-Final | 8/18/2008 | 8/19/2008 | 8/19/2008 4:11:04 PM | P | NR |
|
|
shawn Note: please call 1/2 hr prior to inspection Phone #: ###-####
|
BLD08-00151
| BLD-Final | 8/18/2008 | 8/19/2008 | 8/19/2008 4:10:57 PM | P | NR |
|
|
shawn Note: please call 1/2 hr prior to inspection Phone #: ###-####. Needs public works final. Called Shawn to notify him of final.
|
BLD08-00854
| BLD-Final | 8/18/2008 | 8/19/2008 | 8/19/2008 3:04:55 PM | P | NR |
|
|
larry Phone #: ###-####. Contacted Larry w/EKC to see if code enforcement issues have been resolved. Larry noted that they were not and may have to post a bond. Will call and reschedule.
|
ESC08-00621
| General Inspection | 8/19/2008 | 8/19/2008 | 8/19/2008 2:09:04 PM | P | PASS |
|
|
ESC permit sign is posted. ok.
|
BLD08-01073
| BLD-Foundation | 8/19/2008 | 8/19/2008 | 8/19/2008 1:55:00 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/19/2008 at 6:41:23 AM. Contact: ###-####.
|
BLD08-01015
| BLD-Conference | 8/19/2008 | 8/19/2008 | 8/19/2008 11:36:59 AM | A | PASS |
|
|
Noted inactivity on job site. Called contractor to check on job status. Contractor noted that job was on hold temporarily, but should start back up in the next day or two.
|
BLD07-02434
| BLD-Final | 8/18/2008 | 8/19/2008 | 8/19/2008 10:44:03 AM | A | PASS |
|
|
Plumbing has been finaled.
|
BLD07-02434
| DOC - Permit Finaled | 8/19/2008 | 8/19/2008 | 8/19/2008 10:43:45 AM | P | PASS |
|
|
|
ESC08-00512
| Site Preparation | 8/18/2008 | 8/19/2008 | 8/19/2008 9:20:59 AM | A | PART |
|
|
Spoke with RP about sweeping silts back into contaiment area on south side of project and to post the additional ESC permit sign as previously noted.
|
BLD08-01168
| BLD-Framing/Rough-in | 8/18/2008 | 8/19/2008 | 8/19/2008 9:19:03 AM | A | PART |
|
|
jerry Phone #: ###-####. interior framed walls only, 2nd floor. No grid or hardlids.
|
BLD08-01073
| BLD-Footing | 8/18/2008 | 8/19/2008 | 8/19/2008 8:07:27 AM | A | CANC |
|
|
dane Phone #: ###-####
|