BLD09-01055
| BLD-Final | 8/19/2009 | 8/19/2009 | 8/20/2009 3:02:38 PM | P | PASS |
|
|
|
BLD09-00957
| BLD-Energy code compliance | 8/19/2009 | 8/19/2009 | 8/19/2009 3:36:43 PM | P | PASS |
|
|
|
BLD09-00957
| BLD-Conference | 8/19/2009 | 8/19/2009 | 8/19/2009 3:36:21 PM | P | PASS |
|
|
|
BLD09-00863
| BLD-Framing/Rough-in | 8/19/2009 | 8/19/2009 | 8/19/2009 3:34:58 PM | P | PASS |
|
|
Reinspect Phone #: ###-#### Internet Inspection Request from: Scott Zierler Energy....OK
|
ESC09-00504
| Site Preparation | 8/19/2009 | 8/19/2009 | 8/19/2009 3:34:22 PM | P | CANC |
|
|
NR
|
BLD09-00925
| BLD-Framing/Rough-in | 8/19/2009 | 8/19/2009 | 8/19/2009 3:33:40 PM | P | NR |
|
|
Re-sched...
|
BLD09-00957
| BLD-Energy code compliance | 8/18/2009 | 8/19/2009 | 8/19/2009 11:46:48 AM | A | PASS |
|
|
Dean Phone #: ###-####
|
BLD09-01197
| BLD-Concrete | 8/18/2009 | 8/19/2009 | 8/19/2009 11:38:18 AM | A | PASS |
|
|
John Phone #: ###-####
|
BLD09-00657
| BLD-Final | 8/18/2009 | 8/19/2009 | 8/19/2009 11:37:56 AM | A | NR |
|
|
Need Electr final
|
BLD09-01345
| BLD-Footing | 8/18/2009 | 8/19/2009 | 8/19/2009 11:35:19 AM | A | NR |
|
|
Pat Phone #: ###-####
|
BLD08-02568
| BLD-Other | 8/18/2009 | 8/19/2009 | 8/18/2009 11:53:08 AM | A | PASS |
|
|
shawn - ceiling grid Phone #: ###-#### Ceiling Grid Pass................Disregard previous framing Inspection....(ie...Eng to Ok double stud nai...........) Mistake.....
|