Inspections for the day of: Wednesday, August 19, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00876 General Inspection8/19/20098/19/20098/19/2009 4:31:29 PMPPASS
looked ok
ELE08-03233 Final8/19/20098/19/20098/19/2009 4:27:27 PMPPART
This inspection will be for the engine room. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw 412 and 370 did inspection for this area and other response on 8-5-09, still need locknuts, bushings,conduit strapping, covers and drains installed, condulets closed, ko seals for areas for the engine room, will call for inspection for tomorrow for coreections for disconnect at switchgear area
ELE09-00946 Electrical Rough-In8/19/20098/19/20098/19/2009 4:00:14 PMPPASS
This inspection will be for a wall rough-in. contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw walls and hard lids only ok to cover, 412 and 370 did inspesction as before for p/s
ELE09-01511 Permanent Service8/19/20098/19/20098/19/2009 3:13:56 PMPPASS
Contact Jerry Palmer for instructions. Phone #: ###-#### Internet Inspection Request from: Tina Payne p/s o/h rec ok, no esc this project
ELE09-01527 Temporary Service8/19/20098/19/20098/19/2009 2:52:58 PMPCANC
Dennis Phone #: ###-#### see conference
ELE09-01527 Conference8/19/20098/19/20098/19/2009 1:22:18 PMPDONE
Dennis Phone #: ###-#### called contractor, told to provide access to ground rod, move loose wire out of meter socket, provide abrasion protection for gec, add w/p receptacles, no esc this project
ELE09-01349 Final8/18/20098/19/20098/19/2009 1:18:51 PMPPART
cust is finishing the basement. Phone #: ###-#### Internet Inspection Request from: Stephen Kren owner taken receptacle faces off to trim, loose receptacles, dead circuits, called, left message to call when finished, no esc this project
ELE09-01522 Conference8/18/20098/19/20098/19/2009 9:51:53 AMADONE
Jay Phone #: ###-#### met contractor and owner, reviewed service change and sub-panels, inspection request, left correction for owner NEC 110.26 sufficient access and working space shall be provided and maintained about all electrical equipment, 230.70(A)(!) service disconnecting means shall be installed at a readily accessible location outside of a building, 230.6(2) conductors shall be considered outside of building where installed in raceway encased in not less than 2" of concrete- owner asked for tis correction notice for his own sake, talked about derating conductors, conduit fill, j-boxes, grounding, mast height, no esc this project
ELE08-00407 Electrical Rough-In8/18/20098/19/20098/19/2009 8:53:20 AMAPART
Joe Phone #: ###-#### walls only ok to cover anop
ELE09-01517 Electrical Rough-In8/18/20098/19/20098/18/2009 6:51:47 PMACANC
Internet Inspection Request from: BARRY KENDALL Inspection cancelled from web by: BARRY KENDALL