FIR09-00290
| INSP-Final Inspection | 8/18/2009 | 8/19/2009 | 8/20/2009 8:08:06 AM | A | PART |
|
|
Inspection for riser supervision completed at the remainder of systems on the south side of the building through riser room #4 with the exception of solenoid operation at the interlock/vesda and low air supervisory signals at riser 2 and 4, pre-testing/adjustments done while on site, panel trouble conditions also cleared while waiting on site, one flow switch at freezer system 27 failed to operate. Will test the remainder of sprinkler system monitoring as discussed. Per contractor, WP appliances at the wet produce racks have been installed, open circuts at nac 1,2, and 3 also cleared while on site. Note: during testing a main panel ground fault condition occured.
|
FIR09-00033
| INSP-Alarm Testing | 8/19/2009 | 8/19/2009 | 8/20/2009 8:01:13 AM | P | PART |
|
|
Inspection for riser supervision completed at the remainder of systems on the south side of the building through riser room #4 with the exception of solenoid operation at the interlock/vesda and low air supervisory signals at riser 2 and 4, pre-testing/adjustments done while on site, panel trouble conditions also cleared while waiting on site, one flow switch at freezer system 27 failed to operate. Will test the remainder of sprinkler system monitoring as discussed.
|
FIR09-00033
| INSP-Sprinkler Rough-in | 8/14/2009 | 8/19/2009 | 8/20/2009 7:48:59 AM | A | FAIL |
|
|
Inspection for the class IIIB liquid storage racks system failed due to field installation discrepancies with the approved design layout including head spacing and gridded piping at some locations, also noted missing solid shelving between levels above the forklift aisles. Note: Hydrostatic testing completed- however will need to be redone due to pending modifications for this system.
|
FIR08-00775
| INSP-Final Inspection | 8/14/2009 | 8/19/2009 | 8/20/2009 7:38:59 AM | A | PART |
|
|
See comments per inspection completed by S. Cobbley including areas A, B, D, correction items and adjustments to date.
|
FIR09-00315
| INSP-Final Inspection | 8/18/2009 | 8/19/2009 | 8/20/2009 7:35:20 AM | A | PASS |
|
|
Scope of fire sprinkler modifications completed acceptable, permit finaled.
|
FIR09-00421
| INSP-Final Inspection | 8/18/2009 | 8/19/2009 | 8/20/2009 7:33:57 AM | A | PASS |
|
|
Fire sprinkler permit work passed field inspection, permit finaled.
|
FIR09-00261
| INSP-Sprinkler Rough-in | 8/18/2009 | 8/19/2009 | 8/20/2009 7:33:02 AM | A | PART |
|
|
See approved plan set for red line annotations marked with today's date at two rooms including the restroom and electrical rooms okayed for ceiling cover.
|
FIR08-00631
| INSP-Final Inspection | 8/18/2009 | 8/19/2009 | 8/19/2009 10:13:31 AM | A | PASS |
|
|
Underground fire supply line permit work approved for final status.
|
BLD07-02483
| FIRE-Final Inspection | 8/18/2009 | 8/19/2009 | 8/19/2009 10:12:21 AM | A | PASS |
|
|
Life safety completed acceptable, inspection passed.
|