Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00291 INSP-Sprinkler Rough-in/Hydro8/19/20108/19/20108/19/2010 4:04:11 PMPPASS
sprinkler piping is ok to cover
FIR10-00072 INSP-Sprinkler Rough-in/Hydro8/19/20108/19/20108/19/2010 2:36:35 PMPPASS
Piping rough-in passed except for the two clouded areas marked on the plan in red where the piping has not been installed yet. Also one upright head is blocked by truss web members and is to be relocated as discussed. As-built plans will be required showing the piping routing changes. A hydro test was not performed since the upright needs relocated and none of the permanant sprinkler pendants/sidewalls have been installed. Branch line restraints have not been installed and the longitudinal earthquake bracing has not been installed. The insulation will be required to be installed at the deck since the upright sprinkler heads are located too far below the wood deck.
FIR10-00342 INSP-Supply line flush8/18/20108/19/20108/19/2010 1:39:59 PMPFAIL
The underground had not been unlocked/turned on by United Water. No flushing was performed.
FIR10-00344 INSP-Final Inspection8/18/20108/19/20108/19/2010 1:30:32 PMAPASS
Permit finaled
BLD10-00710 FIRE-Final Inspection8/18/20108/19/20108/19/2010 8:37:10 AMAPASS
Life safety passed. The emergency light located at the remodel area did not function but per the school custodian it is on a work order to be repaired soon.