Inspections for the day of: Friday, August 19, 2011.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-00573 FIRE-Final Inspection8/19/20118/19/20118/26/2011 4:55:12 PMPDONE
BLD11-01865 FIRE-Final Inspection8/19/20118/19/20118/19/2011 5:11:26 PMPCANC
Overbooked
BLD11-01456 FIRE-Final Inspection8/19/20118/19/20118/19/2011 5:08:46 PMPPASS
Life safety inspection for the scope of permit work completed acceptable.
FIR11-00159 INSP-Final Inspection8/19/20118/19/20118/19/2011 5:07:34 PMPCANC
Overbooked
FIR11-00334 INSP-Sprinkler Rough-in/Hydro8/18/20118/19/20118/19/2011 5:07:17 PMPCANC
Overbooked
FIR11-00412 INSP-Sprinkler Rough-in8/19/20118/19/20118/19/2011 5:06:52 PMPCANC
Overbooked
FIR11-00098 INSP-Final Inspection8/19/20118/19/20118/19/2011 5:06:30 PMPCANC
Overbooked
FIR11-00221 INSP-Supply line flush8/19/20118/19/20118/19/2011 5:05:59 PMPPART
UG fire supply line flush completed satisfactory.
BLD11-00416 BLD-Conference8/19/20118/19/20118/19/2011 5:04:42 PMPDONE
john Phone #: ###-####,, 1:30 pm if possible * NOTE: On site conference completed by S. Arellano.
BLD11-01344 FIRE-Sprinkler Rough-in8/19/20118/19/20118/19/2011 5:03:31 PMPDONE
Troy Phone #: ###-####
FIR11-00415 INSP-Sprinkler Rough-in8/19/20118/19/20118/19/2011 5:03:03 PMPCANC
Overbooked
FIR11-00139 INSP-Final Inspection8/17/20118/19/20118/19/2011 5:02:43 PMACANC
Overbooked
FIR11-00026 INSP-Final Inspection8/18/20118/19/20118/19/2011 5:01:48 PMAPART
Completed remainder of acceptance testing for the new system. Final pending installation and testing of the new IP-DACT per approved plan.
BLD10-01853 FIRE-Final Inspection8/18/20118/19/20118/19/2011 5:00:13 PMANR
Final pending project related fire alarm and sprinkler permit finals. Also noted missing exit signs at the 2nd and 3rd floors, need to add discharge lighting at the south exit, discussed project schedule.
FIR10-00540 INSP-Final Inspection8/18/20118/19/20118/19/2011 4:57:54 PMAPART
Items which remain for final include; ceilings at the bike and storage rooms- remove travel caps and install escutcheons on sw heads, remove thermal elements at the four deluge heads on the 1st floor, missing escutcheon at the 3rd floor, noted one closet at AV 222 missing coverage.
FIR10-00473 INSP-Final Inspection8/19/20118/19/20118/19/2011 4:53:56 PMAPASS
UG fire supply line permit finaled.
FIR10-00293 INSP-Final Inspection8/18/20118/19/20118/19/2011 4:53:17 PMANR
Phone #: ###-#### >> Inspection requested via web by Tyler Bowen
FIR10-00467 INSP-Final Inspection8/18/20118/19/20118/19/2011 4:52:48 PMAFAIL
Floor plan and design layout matches the demo sheet- see A2.0 for new floorplan and room designation, incorrect cd settings at two locations including the conference and open office area, provide plans reflecting the added notification device, one-line etc.
FIR11-00411 INSP-Final Inspection8/18/20118/19/20118/19/2011 4:47:02 PMAPASS
Scope of work completed, fire sprinkler permit finaled.
FIR11-00411 INSP-Sprinkler Rough-in8/19/20118/19/20118/19/2011 4:46:00 PMPPART
Overhead fire sprinkler work okayed for cover at the drop ceilings.
BLD11-01344 FIRE-Sprinkler Rough-in8/19/20118/19/20118/19/2011 4:45:04 PMANR
Inspection for new heads at the sheetrock ceiling servery entry area- noted new partition and doors not yet installed may create overspacing at adjacent pendents. Project lacks fire sprinkler plans including shop drawings at this time.
FIR10-00346 INSP-Final Inspection8/18/20118/19/20118/19/2011 4:40:33 PMAFAIL
Began testing at the high school brick building address 5493 and modulars #1 and #2. Noted corrections include items on review notes # 7, 20, 25 and 13.
FIR11-00213 INSP-Final Inspection8/18/20118/19/20118/19/2011 4:36:03 PMAPASS
Fire alarm permit final approved.