Inspections for the day of: Friday, August 19, 2011.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC11-02567 Final8/19/20118/19/20118/23/2011 9:42:08 AMPPASS
new drops ok
MEC11-02086 Final8/18/20118/19/20118/19/2011 11:57:59 AMAPASS
Scheduled final for 8/19/2011 AM. Homeowner, James Dawson, can be reached at ###-#### if needed. Phone #: ###-#### >> Inspection requested via web by Katie Smith
MIS11-00203 MEC-Final8/19/20118/19/20118/19/2011 11:19:51 AMPPASS
Rhonda Phone #: ###-####...oven approved for installation under type 1 hood..gas line was capped
GCM11-00130 GCM-Pressure Test8/18/20118/19/20118/19/2011 10:44:15 AMAPASS
Debbie @ ###-####....20lb gas ok
MEC11-02493 Rough-in8/18/20118/19/20118/19/2011 10:41:35 AMANR
jeff Phone #: ###-####...no manual J on site
GCM11-00125 GCM-Rough In & Pressure Test8/18/20118/19/20118/19/2011 9:17:41 AMAFAIL
Debbie @ ###-####Duct Blast Test at 2 pm...no manual j on site..threre are no building plans on site either...no access to attic furnace..fir out wood where dryer vent is smashed..I have ask you to call me the day before to schedule the duct blaster test, so I can make sure I'm available
GCM11-00135 GCM-Final8/17/20118/19/20118/19/2011 8:46:14 AMAPASS
Bob @ ###-####Call in advance9 am inspection