BLD14-02336
| FIRE-Final Inspection | 8/18/2014 | 8/19/2014 | 8/19/2014 3:29:02 PM | P | FAIL |
|
|
Provide sticker at main exit, provide tagged and mounted fire extinguisher and either repair or remove the non-functional exit sign
|
FIR14-00546
| INSP-Final Inspection | 8/19/2014 | 8/19/2014 | 8/19/2014 3:14:32 PM | P | PART |
|
|
A temporary occupancy is being given with Scott's permission until the required smoke detector has been installed at the NAC panel
|
FIR14-00545
| INSP-Final Inspection | 8/18/2014 | 8/19/2014 | 8/19/2014 3:13:35 PM | P | PART |
|
|
A temporary occupancy is being given with Scott's permission until the required smoke detector is installed at the NAC panel.
|
BLD13-01688
| FIRE-Final Inspection | 8/18/2014 | 8/19/2014 | 8/19/2014 3:03:56 PM | A | PART |
|
|
Life safety is complete in the Locker Rooms/Storage/PACU areas.
|
FIR14-00279
| INSP-Alarm Testing | 8/18/2014 | 8/19/2014 | 8/19/2014 3:01:50 PM | A | DONE |
|
|
Fire alarm in the Locker Rooms/Storage/PACU areas is complete.
|
FIR13-00697
| INSP-Final Inspection | 8/15/2014 | 8/19/2014 | 8/19/2014 3:01:03 PM | A | PART |
|
|
Fire sprinkler work in the Locker Rooms/Storage/PACU areas is complete.
|
FIR13-00384
| INSP-Final Inspection | 8/19/2014 | 8/19/2014 | 8/19/2014 1:43:31 PM | P | PASS |
|
|
Permit finaled
|
BLD14-01536
| FIRE-Final Inspection | 8/18/2014 | 8/19/2014 | 8/19/2014 9:55:34 AM | A | PASS |
|
|
Life safety passed. See the project related fire alarm permit for correction steve is going to address.
|
FIR14-00504
| INSP-Final Inspection | 8/18/2014 | 8/19/2014 | 8/19/2014 9:39:19 AM | A | PASS |
|
|
Permit finaled. The horn/sync does not match between the new tenant and the existing restrooms. Steve is going to get the ball rolling on getting it fixed.
|