FIR15-00216
| INSP-Sprinkler Rough-in | 8/19/2015 | 8/19/2015 | 8/19/2015 3:16:26 PM | P | FAIL |
|
|
Tenting failed in the southeast apartment second floor at the top of the stairs.
|
BLD14-03486
| FIRE-Final Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 3:09:38 PM | P | FAIL |
|
|
1) Breakroom 108 exit has been moved from interior doors to exterior door. Need approval with the 118 person occupant load. 2) Provide emergnecy light in Fire Pump Rm 3)Repair Emergency Lights in Locker Rms. 4) Provide signage at Fire Pump Rm. 5) Provide exit discharge lighting without photo cells and timers per discussion.
|
BLD14-02926
| FIRE-Final Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 3:05:02 PM | P | FAIL |
|
|
Fire life safety will be ok to pass when the project related fire alarm and fire sprinkler permits are finaled
|
BLD14-02396
| FIRE-Final Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 3:02:40 PM | P | FAIL |
|
|
Provide fire dept access signage as per note #12. All other items appear ok.
|
FIR15-00222
| INSP-Sprinkler Rough-in/Hydro | 8/18/2015 | 8/19/2015 | 8/19/2015 12:58:27 PM | A | PASS |
|
|
Overhead hydro test passed
|
FIR15-00223
| INSP-Sprinkler Rough-in/Hydro | 8/18/2015 | 8/19/2015 | 8/19/2015 12:57:54 PM | A | PASS |
|
|
Overhead hydro test passed
|
FIR15-00495
| INSP-Final Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 11:27:11 AM | P | PASS |
|
|
Permit finaled
|
FIR14-00475
| INSP-Sprinkler Rough-in/Hydro | 8/18/2015 | 8/19/2015 | 8/19/2015 10:58:59 AM | A | PASS |
|
|
Overhead hydro passed for the second floor
|
BLD15-00289
| FIRE-Final Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 9:31:08 AM | P | PASS |
|
|
Life safety passed
|
FIR15-00538
| INSP-Sprinkler Rough-in | 8/18/2015 | 8/19/2015 | 8/19/2015 9:17:54 AM | A | PASS |
|
|
Underground supply piping is ok to cover. I noted that some of the pipe runs are short in distance and United Water supplied stub-in is only at 36" below finish grade.
|
FIR15-00537
| INSP-Sprinkler Rough-in | 8/18/2015 | 8/19/2015 | 8/19/2015 9:17:24 AM | A | PASS |
|
|
Underground supply piping is ok to cover. I noted that some of the pipe runs are short in distance and United Water supplied stub-in is only at 36" below finish grade.
|
FIR15-00533
| INSP-Sprinkler Rough-in | 8/18/2015 | 8/19/2015 | 8/19/2015 9:16:56 AM | A | PASS |
|
|
Underground supply piping is ok to cover. I noted that some of the pipe runs are short in distance and United Water supplied stub-in is only at 36" below finish grade.
|
FIR15-00536
| INSP-Sprinkler Rough-in | 8/18/2015 | 8/19/2015 | 8/19/2015 9:16:27 AM | A | PASS |
|
|
Underground supply piping is ok to cover. I noted that some of the pipe runs are short in distance and United Water supplied stub-in is only at 36" below finish grade.
|
FIR15-00535
| INSP-Sprinkler Rough-in | 8/18/2015 | 8/19/2015 | 8/19/2015 9:15:51 AM | A | PASS |
|
|
Underground supply piping is ok to cover. I noted that some of the pipe runs are short in distance and United Water supplied stub-in is only at 36" below finish grade.
|
FIR15-00470
| INSP-Final Inspection | 8/18/2015 | 8/19/2015 | 8/19/2015 8:11:16 AM | A | PASS |
|
|
permit finaled
|
FIR15-00468
| INSP-Final Inspection | 8/18/2015 | 8/19/2015 | 8/19/2015 8:04:47 AM | A | PASS |
|
|
Permit finaled
|
BLD15-00788
| FIRE-Final Inspection | 8/18/2015 | 8/19/2015 | 8/19/2015 7:27:14 AM | A | PASS |
|
|
Life safety passed
|
FIR15-00467
| INSP-Sprinkler Rough-in/Hydro | 8/18/2015 | 8/19/2015 | 8/19/2015 12:00:00 AM | A | CANC |
|
|
Troy, We would like to schedule this for late morning if at all possible. Thank you. Jason ###-####. Phone #: ###-#### >> Inspection requested via web by Jason Minnick
|