Inspections for the day of: Wednesday, August 19, 2015.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00035 General Inspection8/19/20158/19/20158/19/2015 1:24:49 PM PASS
Project is complete. In stabilization phase. Lots abutting road have been pre-graded for future construction.

Some temp BMPs (orange silt fence) still installed at east end of project due to ongoing stabilization.

No corrections.
ESC15-00225 Aging Inspection8/19/20158/19/20158/19/2015 12:58:54 PM PASS
Sign installed and operational. All construction at St. Al's Bown Crossing. ESC permit finaled.
ESC15-00225 DOC - Permit Finaled8/19/20158/19/20158/19/2015 12:54:25 PMPPASS
ESC15-00023 General Inspection8/19/20158/19/20158/19/2015 12:00:40 PM PART
WIP.

Dirt being contained on site. Sidewalk in decent condition. DI bag installed.

Correction:
- haul away trash in bin, it is over flowing.
ESC15-00872 Site Preparation8/19/20158/19/20158/19/2015 11:49:32 AMPPASS
Clint Phone #: ###-####

Tahoe Homes operations in East Valley are in compliance. Multiple lined washouts installed to accomodate lots of active SFHs at once. No trackout. Trash and materials are contained, no litter issues. DI bags installed

Approved.
ESC15-00244 Aging Inspection8/19/20158/19/20158/19/2015 11:40:59 AM PASS
WIP. Last Hunter Home on Barnside block yet to be completed or landscaped. No issues at site, no trackout or discharges.

After completion, will have Hunter clean up sand and sediment at DI filter bags and have bags removed. For now they should stay in place.
ESC15-00239 Aging Inspection8/19/20158/19/20158/19/2015 11:39:09 AM PASS
Home near completion. Interior work only. BLD is open. Yard landscaped and stabilized. Trash and materials from site has been cleaned. No further ESC inspections required; ESC permit finaled.
ESC15-00239 DOC - Permit Finaled8/19/20158/19/20158/19/2015 11:37:57 AMPPASS
ESC15-00239 DOC - Permit Finaled8/19/20158/19/20158/19/2015 11:27:16 AMPPASS
ESC15-00239 DOC - Permit Finaled8/19/20158/19/20158/19/2015 11:26:16 AMPPASS
ESC15-00994 Site Preparation8/18/20158/19/20158/19/2015 10:55:01 AMAPART
Sam Phone #: ###-####

Permit sign posted with contact information. Site applied with ESC plan waiver.

Wattles and silt fence have been installed around the perimeter, but were not trenched in properly, specifically around the project area.

Requested to Sam with Idaho Landscape to have his crew reinstall the BMPs properly.

DIs on Montclair have protection.

Will re-inspect the BMP installation this Friday
ESC15-00151 General Inspection8/19/20158/19/20158/19/2015 10:17:20 AM PASS
Project complete and stabilized. DI bag at Burnside was removed by Sterling. Permit finaled.
ESC15-00151 DOC - Permit Finaled8/19/20158/19/20158/19/2015 10:16:34 AMPPASS
ESC15-00344 General Inspection8/19/20158/19/20158/19/2015 9:59:13 AMPPASS
WIP on foundation. Construction entrance installed and permit sign posted.

Located in flat industrial park with topography that drains runoff inward. No wind blown trash or trackout.

No corrections at this time.
ESC15-00845 Site Preparation8/18/20158/19/20158/19/2015 9:56:34 AMAPASS
Jeff Phone #: ###-####

RP-GC on site meeting. Project will occur behind active project ESC15-00344 (same builder). Construction entrance installed, permit sign is posted. Small sweeper unit available for any trackout.

Lot is reclaimed land and fill and was formerly a gravel pit. The surfcace drainage ponds in the middle of the lot and infiltrates at a high rate.

Lined concrete washout pit to be installed between buildings.
Aprroved for construction.
ESC14-00989 General Inspection8/19/20158/19/20158/19/2015 9:15:19 AM PASS
No changes since previous inspection. No violations.
ESC15-00022 General Inspection8/19/20158/19/20158/19/2015 8:51:24 AM PASS