PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, August 19, 2016
.
Number of inspections:
29
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Mike Jordan
Title
BLD-COM/RES INSPECTOR
Phone #
794-9473
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
BLD14-03207
BLD-Conference
8/18/2016
8/19/2016
8/19/2016 4:46:40 PM
P
PART
Final, Area C Retail. Call adam when on site. thanks. AKJ
GBAD Misc Framing, approve for cover.
5th Floor Final reinspection.
Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson. Ok for temp occ on 5th. floor core restrooms, lockers, and showers only. A seperate permit will be required to occupy remainder of 5th. floor. Ok for temp. occ on area C retail for BSU bike storage. All requirements have been met of signed letter for 90 day temp occ. Interior steel stud framed walls and soffits, for first floor GBAD lobby. No exterior walls can be covered in this area yet. Hardlids in basement for womens restroom. Contractor to remove sheet rock from mens restroom for hardlid inspection. 4th floor ceiling grid at north ball room ok only.
BLD16-01458
BLD-Final
8/19/2016
8/19/2016
8/19/2016 4:40:06 PM
P
PASS
Tom Phone #: ###-####
BLD16-01458
DOC - Permit Finaled
8/19/2016
8/19/2016
8/19/2016 4:39:59 PM
P
PASS
BLD15-01919
BLD-Final
8/18/2016
8/19/2016
8/19/2016 4:12:08 PM
P
CANC
Please give me a call 20 minutes before you plan to be there. I''m not on site. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD16-03063
BLD-Wall Bracing
8/19/2016
8/19/2016
8/19/2016 3:53:20 PM
P
PASS
would like call ahead; Lucas Phone #: ###-####
BLD16-01269
BLD-Final
8/19/2016
8/19/2016
8/19/2016 3:42:39 PM
P
CANC
ESC16-00511
Site Final
8/19/2016
8/19/2016
8/19/2016 3:31:42 PM
P
DONE
ESC16-00511
DOC - Permit Finaled
8/19/2016
8/19/2016
8/19/2016 3:31:25 PM
P
PASS
BLD16-01268
BLD-Final
8/19/2016
8/19/2016
8/19/2016 3:30:20 PM
P
PASS
Phone #: 2085134849 >> Inspection requested via mobile web by Cody
BLD16-01268
DOC - Permit Finaled
8/19/2016
8/19/2016
8/19/2016 3:30:03 PM
P
PASS
BLD16-01252
BLD-Final
8/19/2016
8/19/2016
8/19/2016 2:48:14 PM
P
PASS
Kent Phone #: ###-####. New code compliant main entry/exit doors have been installed. Ok for perm occ.
BLD16-01720
BLD-Conference
8/19/2016
8/19/2016
8/19/2016 2:40:17 PM
P
DONE
Phone #: ###-#### Inspection requested via web by Todd Stern
BLD16-01720
DOC - Permit Finaled
8/19/2016
8/19/2016
8/19/2016 2:40:07 PM
P
PASS
All work appeared to be done in acordance with local codes and ordinances.
BLD16-00462
BLD-Conference
8/19/2016
8/19/2016
8/19/2016 2:38:56 PM
P
DONE
Phone #: ###-#### Inspection requested via web by Todd Stern
BLD16-00462
DOC - Permit Finaled
8/19/2016
8/19/2016
8/19/2016 2:38:42 PM
P
PASS
All work appeared to be done in accordance with local codes and ordinances.
BLD16-01011
BLD-Final
8/19/2016
8/19/2016
8/19/2016 2:13:46 PM
P
PASS
Joe Phone #: ###-####
BLD16-01011
DOC - Permit Finaled
8/19/2016
8/19/2016
8/19/2016 2:13:38 PM
P
PASS
BLD16-02630
BLD-Footing
8/18/2016
8/19/2016
8/19/2016 1:35:41 PM
P
PART
Don Phone #: ###-####
BLD16-00963
BLD-Framing/Rough-in
8/19/2016
8/19/2016
8/19/2016 1:31:11 PM
P
PART
David Phone #: ###-####. Ok to sheet. Need RFI from engineer for epoxy into existing CMU. CMU is hollow at this location. Also notified contractor that special inspection is required on epoxy.
BLD16-00959
BLD-Final
8/18/2016
8/19/2016
8/19/2016 11:44:23 AM
A
DONE
Steve Phone #: ###-####
BLD16-00959
DOC - Permit Finaled
8/19/2016
8/19/2016
8/19/2016 11:44:12 AM
P
PASS
BLD16-02630
BLD-Conference
8/18/2016
8/19/2016
8/19/2016 10:15:12 AM
A
DONE
Don Phone #: ###-####-please call when 20 minutes prior to meet
BLD16-01644
BLD-Framing/Rough-in
8/18/2016
8/19/2016
8/19/2016 9:57:02 AM
A
PASS
Pete Phone #: ###-####. Interior steel stud framed walls only ok. no grid. Will need to check for penetrations in 1hr. floor ceiling on grid inspection.
ESC16-00993
Site Final
8/19/2016
8/19/2016
8/19/2016 9:08:48 AM
A
DONE
ESC16-00993
DOC - Permit Finaled
8/19/2016
8/19/2016
8/19/2016 9:08:37 AM
P
PASS
BLD16-01458
BLD-Final
8/18/2016
8/19/2016
8/19/2016 9:08:12 AM
A
NR
Tom Phone #: ###-####. Needs blower door test. Everything else ok.
BLD16-02494
BLD-Final
8/18/2016
8/19/2016
8/19/2016 9:07:36 AM
A
PASS
Ben Phone #: ###-####
BLD16-02494
DOC - Permit Finaled
8/19/2016
8/19/2016
8/19/2016 9:07:12 AM
P
PASS
BLD16-01269
BLD-Final
8/18/2016
8/19/2016
8/19/2016 8:31:29 AM
A
NR
Phone #: 2085134849 >> Inspection requested via mobile web by Cody Walker. rescheduled for pm inspection.