ELE96-02524
| INSP - Electrical Rough-In | 8/1/1996 | 8/2/1996 | 8/2/1996 12:00:00 AM | A | PASS |
|
|
08/02/96 403 - BOISE CONSUMER CO-OP/ REMODEL/ NEW FIXTURES, CHECKSTANDS, INSPECTION TO COVER DELI OUTLETS.
|
ELE96-00844
| INSP - Final | 8/1/1996 | 8/2/1996 | 8/2/1996 12:00:00 AM | A | PASS |
|
|
08/02/96 403 -
|
ELE96-02392
| INSP - Electrical Rough-In | 8/2/1996 | 8/2/1996 | 8/2/1996 12:00:00 AM | P | PASS |
|
|
08/02/96 403 -
|
ELE96-02446
| INSP - Electrical Rough-In | 8/2/1996 | 8/2/1996 | 8/2/1996 12:00:00 AM | P | NH |
|
|
08/02/96 403 - EARLY PM PLEASE. LEFT CARD...MB403
|
ELE96-02528
| INSP - Ele Rough-In/Perm Svc | 8/2/1996 | 8/2/1996 | 8/2/1996 12:00:00 AM | P | N.R. |
|
|
14 ROOMS AC 200AMP reayd late SERVICE INCOMPLETE.
|
ELE96-02528
| INSP - Conference | 8/2/1996 | 8/2/1996 | 8/2/1996 12:00:00 AM | P | PASS |
|
|
|
ELE96-02528
| INSP - Conference | 8/5/1996 | 8/2/1996 | 8/2/1996 12:00:00 AM | P | PASS |
|
|
|
ELE96-02530
| INSP - Hot Tubs/Spas | 8/2/1996 | 8/2/1996 | 8/2/1996 12:00:00 AM | P | PASS |
|
|
08/02/96 403 -
|