PLM00-02700
| Plumbing Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 13:45:26. Contact: ###-####.
|
PLM00-02706
| Plumbing Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | A | PASS |
|
|
###-#### waste and vent test failed 8/2/2000 9:35:31 AM
|
PLM00-02269
| Final | 8/1/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 16:24:06. Contact: ###-####. rps installed in an area with no drainage, hub drain in area not in general use of the occupants 8/2/2000 10:56:34 AM
|
PLM99-03980
| Plumbing Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 16:39:08. Contact: ###-####.
|
PLM00-01935
| Final | 8/2/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 8/2/2000 6055 plateau view craig johnson ###-####
|
PLM00-02711
| Water and/or Sewer | 8/2/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | P | PASS |
|
|
###-#### sewer ok need access to turnaround left message 8/2/2000 3:02:25 PMgot access to crawl randy holmes is going to remove 4" waste from bathrooms at the time of remodel and connect to the new building drain he just installed which is 3" 8/2/2000 4:35:16 PM
|
PLM00-02265
| Final | 8/2/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | P | FAIL |
|
|
###-#### turn on water, turn down 90 on wh t&p 8/2/2000 1:40:32 PM
|
PLM00-02714
| Plumbing Rough-in | 8/2/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | P | PASS |
|
|
GENE -###-#### R/I
|