MEC00-02571
| Final | 8/1/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 15:39:04. Contact: ###-####. Get access 8/2/00 3:11:44 PM
|
BLD00-01828
| BLD-Framing/Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | A | PART |
|
|
###-####
shear wall ok 8/2/2000 9:25:40 AM
|
BLD00-01582
| BLD-Footing | 8/1/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | A | PART |
|
|
###-####
work in progress 8/2/2000 9:49:16 AM
|
BLD98-01409
| BLD-Footing | 8/1/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 14:22:07. Contact: .
will call back in special inspector will be on job per foreman 8/2/2000 4:01:02 PM
|
BLD00-01120
| BLD-Footing | 8/1/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | P | PART |
|
|
BRIAN--###-#### CELL FT
w.i.p. appears ok, will call back in 8/2/2000 3:44:57 PM
|
BLD00-01583
| BLD-Footing | 8/2/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | P | PART |
|
|
jeff- ###-#### ft
|
BLD00-02154
| BLD-Footing | 8/2/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | P | PART |
|
|
Shelby ###-####
|
BLD00-00683
| BLD-Framing/Rough-in | 8/2/2000 | 8/2/2000 | 8/2/2000 12:00:00 AM | P | PART |
|
|
###-####
ok to insulate 8/2/2000 4:40:04 PM
|