PLM01-02571
| Water and/or Sewer | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 8/1/2001 1:57:04 PM interceptor and pump chamber test interceptor tests ok no piping yet 8/2/2001 9:16:53 AM
|
PLM01-01737
| Final | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 15:16:28. Contact: ###-####. t&p drains are backgraded in exterior walkway, remove water heater flex in t&p drain, provide drain hole, secure dishwsher hose to counter top height, complete trim 8/2/2001 8:46:55 AM
|
PLM01-01647
| Final | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 8/2/2001 9:30:04 AM pvb's ok but need to be tested
|
PLM01-01371
| Final | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | PASS |
|
|
fn john- ###-####
|
PLM01-02601
| Water and/or Sewer | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | PASS |
|
|
###-#### water line only
|