Inspections for the day of: Thursday, August 2, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01535 BLD-Final8/1/20018/2/20018/2/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/01/2001 at 20:30:33. Contact: ###-####. c/n, mecchek, may need p&z ok, clarify 8/2/2001 12:18:30 PM
BLD01-01106 BLD-Energy code compliance8/1/20018/2/20018/2/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 08/01/2001 at 22:48:31. Contact: ###-####...need htg, called to cancel 8/2/2001 12:17:25 PM
MEC01-01125 Final8/2/20018/2/20018/2/2001 12:00:00 AMAPASS
###-####
BLD01-00312 BLD-Final8/1/20018/2/20018/2/2001 12:00:00 AMANR
fn- call 1st before insp natalie ###-#### ext 33 unable to verify all insps & shaft for hood, recall 8/2/2001 12:19:17 PM
BLD01-01689 BLD-Foundation8/1/20018/2/20018/2/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/01/2001 at 18:21:32. Contact: ###-####.
BLD01-00531 BLD-Conference8/1/20018/2/20018/2/2001 12:00:00 AMPPASS
scott ###-####, w/ bldr re exhaust duc 8/2/2001 5:39:39 PM s 8/2/2001 5:39:47 PM
BLD01-01349 BLD-Final8/2/20018/2/20018/2/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/02/2001 at 10:12:11. Contact: ###-####.c/n, base/wall finishes, ADA mirrors at restrms; clarify deletions/modifications; obtain all perm finals, etc. OK for t/o, card to contractor. 8/3/2001 2:39:02 PM
BLD01-01349 BLD-Other8/2/20018/2/20018/2/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/02/2001 at 10:15:10. Contact: ###-####...conf. w/ bldr 8/2/2001 5:39:02 PM
BLD01-01469 BLD-Footing8/2/20018/2/20018/2/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/02/2001 at 10:29:40. Contact: ###-####...panels ok pend spec insp report 8/2/2001 3:54:03 PM
BLD01-01535 BLD-Conference8/2/20018/2/20018/2/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 8/2/2001 3:49:23 PM no underfloor insul ok; still need to verify if p&z ok for final.
BLD98-03705 BLD-Conference8/2/20018/2/20018/2/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 8/2/2001 4:07:40 PM c/n: maintain exits from existing bldg & provide pedestrian protection as needed (canopies,boardwalk, or exit passageways)...again, submit utility & hvac plans; some site work being performed... and elec power being brought in by Id. Power. Site fenced.
BLD01-01492 BLD-Conference8/2/20018/2/20018/2/2001 12:00:00 AMPPASS
don ###-#### w/ Don & GS; submit for ADA compliance at restroom. 8/2/2001 3:34:07 PM
BLD01-00701 BLD-Final8/2/20018/2/20018/2/2001 12:00:00 AMPPASS
Ed ###-#### mechanical final is needed also