PLM01-02004
| Plumbing Rough-in | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PART |
|
|
r/i- scott ###-#### need tosupport water every 32 inches, regade and support drains every 4 feet same with vent,s need approved transition from abs to pvc , need 4 inch up to first toilet for fixture loading on drains correct reverse grade on 3 inch trunk line onwest end of builbing 8/2/2001 1:19:51 PM
|
PLM01-02522
| Plumbing Rough-in | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 360 On 8/1/2001 4:36:18 PM air test on D.W.V. failed . need to nail plate all down staires plumbing called contractor 8/2/2001 10:55:21 AM
|
PLM01-02066
| Final | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PASS |
|
|
fn insp ###-####- craig lock box on front door 193
|
PLM01-01985
| Final | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PASS |
|
|
craig ###-#### fn --lock box on front door 193
|
PLM01-02565
| Sprinkler (Final) | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 08:43:08. Contact: ###-####.
|
PLM01-02594
| Plumbing Rough-in | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-02522
| Plumbing Rough-in | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 8/2/2001 10:52:47 AM
|
PLM01-02602
| Water and/or Sewer | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 11:17:05. Contact: ###-####. new water line tie in,s ok ok to cover need to have p.v.b device retested and recertified 8/2/2001 3:03:16 PM
|