ELE01-02597
| Electrical Rough-In | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PART |
|
|
###-####. r/i only, service not completed. 8/2/2001 10:47:38 AM
|
ELE01-00975
| Final | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PASS |
|
|
###-####. completed.
8/2/2001 12:37:52 PM
|
ELE01-02342
| Rough-In Permanent Service | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PART |
|
|
reinspection ###-#### . ele r/i only; u-fer not correct. 8/2/2001 11:59:15 AM
|
ELE01-02611
| Electrical Rough-In | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PART |
|
|
###-####. addition; r/i only. 8/2/2001 11:21:24 AM
|
ELE01-00755
| Final | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | FAIL |
|
|
dave ###-####. not completed. 8/2/2001 1:57:53 PM
|
ELE01-02583
| Final | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 16:42:09. Contact: ###-####. perm/svc. tri-plex should be installed. power connected by contractor.
p/s oh r mitchell ele #2583 ok. 8/2/2001 2:56:00 PM
|
ELE01-01467
| Final | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PASS |
|
|
late pm ###-####. completed. 8/2/2001 4:25:16 PM
|
ELE01-02628
| Electrical Rough-In | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | PASS |
|
|
for conference insp- call 1st before insp-15 or 20 min leadway-###-#### cell--all valley.
service/switch-gear disconnects. 8/2/2001 1:25:50 PM
|
ELE01-02245
| Electrical Rough-In | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 10:22:19. Contact: ###-####. seperate permit required for temporary service. 8/2/2001 2:25:07 PM
|