BLD00-02813
| BLD-Energy code compliance | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 11:34:10. Contact: ###-####.. ok except some of the 2 hr area sep wall will recall. 8/2/2001 11:28:59 AM
|
BLD01-01180
| BLD-Framing/Rough-in | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | NR |
|
|
john ###-#### & ###-#### cell. needs other r-i's done prior to calling for a frame. 8/2/2001 10:29:29 AM
|
BLD01-00720
| BLD-Other | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 14:50:41. Contact: ###-####.
|
MEC00-04134
| Pressure Test | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 16:19:48. Contact: ###-####.c/n posted only 12 psi at guage. 8/2/2001 9:32:56 AM
|
BLD01-01618
| BLD-Final | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 09:32:59. Contact: ###-####..called contractor about adding addnl fasteners to tails on trellis,NOTE: Again no details on approved plans for this connection. 8/2/2001 12:25:43 PM
|
BLD01-01101
| BLD-Conference | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 09:46:06. Contact: ###-####..c/n posted. 8/2/2001 4:13:37 PM
|
BLD01-01984
| BLD-Footing | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | PART |
|
|
Todd ###-####
|
BLD01-01985
| BLD-Footing | 8/2/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | PART |
|
|
Todd ###-####
|
BLD01-01959
| BLD-Wall cover | 8/1/2001 | 8/2/2001 | 8/2/2001 12:00:00 AM | P | PASS |
|
|
###-####- walt gammill wall cover
|
BLD01-01466
| BLD-Foundation | 8/1/2001 | 8/2/2001 | 8/1/2001 12:00:00 AM | A | PASS |
|
|
###-#### lace
|