Inspections for the day of: Thursday, August 2, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01966 BLD-Footing8/1/20018/2/20018/2/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/01/2001 at 11:53:32. Contact: ###-####.
ftg pads already poured, looks like they were per plan, also framing conf. on deck, will recheck items at final, better bearing on beam 8/2/2001 10:39:05 AM
BLD01-00848 BLD-Final8/1/20018/2/20018/2/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/01/2001 at 14:39:51. Contact: ###-####.need hardwire S.D. in bedroom, hand rail on rear steps. 8/2/2001 11:58:33 AM
MEC01-02280 Final8/1/20018/2/20018/2/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/01/2001 at 15:24:31. Contact: ###-####.
look at fan later, gas pass, furnace ok 8/2/2001 9:54:56 AM
BLD01-01390 BLD-Framing/Rough-in8/1/20018/2/20018/2/2001 12:00:00 AMAPART
shear --josh -###-####
ext. shear ok 8/2/2001 11:17:53 AM
MIS01-00139 BLD-Conference8/2/20018/2/20018/2/2001 12:00:00 AMAPART
t/ w tenent or owner when he called me today, said I could have been attacked by his 2 rottwilier?/ greatdane? dogs, said that no work is being or has been done that requires a permit, also said ex girl friend may be messing w/ him, said he will get permit if work is going to be done. 8/2/2001 10:45:30 AM
BLD01-00269 BLD-Final7/29/20018/2/20018/2/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/29/2001 at 13:41:12. Contact: ###-####.
BLD01-01275 BLD-Framing/Rough-in8/1/20018/2/20018/2/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/01/2001 at 09:15:09. Contact: ###-####.c/n posted, do not insulate 8/2/2001 1:36:04 PM
BLD01-00747 BLD-Foundation8/2/20018/2/20018/2/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/02/2001 at 11:08:19. Contact: ###-####.already poured, si was on site, pending rpt 8/6/2001 8:11:08 AM
BLD01-02115 BLD-Footing8/2/20018/2/20018/2/2001 12:00:00 AMPPASS
ft david-- ###-####
BLD01-00269 BLD-Final8/2/20018/2/20018/2/2001 12:00:00 AMPPASS
after 3 pm , ###-#### 8/2/2001 11:30:13 AM
BLD01-01339 BLD-Concrete8/2/20018/2/20018/2/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/02/2001 at 10:03:13. Contact: .
wip, verbal warnings/ corrections 8/2/2001 2:11:51 PM
BLD00-03627 BLD-Framing/Rough-in8/1/20018/2/20018/1/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/01/2001 at 11:03:48. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/01/2001 at 11:28:30.