MIS02-00180
| BLD-Final | 8/1/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | A | FAIL |
|
|
late am scheduled for a final fire early am ###-####c/n on site. 8/2/2002 10:05:02 AM
|
BLD02-01856
| BLD-Footing | 8/1/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-01276
| BLD-Final | 8/1/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | A | PASS |
|
|
MACHILE ###-####
|
BLD01-02848
| BLD-Final | 8/1/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | A | PART |
|
|
10:00 am apointment. temp occ for exit path around fab on first floor and all stair inclosers.for tool instal in the fab. no chem load in the bldg. with out approval and sign off for total bldg. occ. 8/2/2002 1:04:24 PM
|
BLD02-01278
| BLD-Final | 8/2/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | A | PART |
|
|
ok for temp card not on site, 8/2/2002 10:46:46 AM
|
BLD02-01750
| BLD-Framing/Rough-in | 8/2/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | P | NR |
|
|
mike; Phone #: ###-#### need plm sign off 8/2/2002 2:26:08 PM
|
BLD02-01247
| BLD-Final | 8/2/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | P | CANC |
|
|
DUANE; Phone #: ###-#### carl will do insp. 8/2/2002 4:25:02 PM
|
BLD02-01807
| BLD-Footing | 8/2/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | P | PART |
|
|
BILL; Phone #: ###-#### ft ok 8/2/2002 1:47:16 PM
|
BLD02-01374
| BLD-Final | 8/2/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | P | FAIL |
|
|
; Phone #: ###-####aproval of ada counter/ fire collor and smoke seal./ hole in ceilling basement. 8/2/2002 4:09:03 PM
|
BLD02-01769
| BLD-Conference | 8/2/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | P | PART |
|
|
previous c/n not valid/ floor ok to cover. 8/2/2002 4:24:03 PM
|
BLD02-01769
| BLD-Conference | 8/2/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | P | CANC |
|
|
|
BLD02-01769
| BLD-Other | 8/1/2002 | 8/2/2002 | 8/2/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/01/2002 at 17:50:14. Contact: ###-####.patch hole in ceilling of basmwent fire collor of 4 " pvc smokeseal fire doors/ aproval of ada counter top not per plan. 8/2/2002 4:05:46 PM
|