Inspections for the day of: Friday, August 2, 2002.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01514 BLD-Foundation8/1/20028/2/20028/2/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/01/2002 at 15:51:29. Contact: ###-####. wip--95% ready. Rebar in place. 8/2/2002 12:05:37 PM
BLD02-01607 BLD-Foundation8/1/20028/2/20028/2/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/01/2002 at 15:53:09. Contact: ###-####. wip--95% ready--rebar in place. 8/2/2002 12:05:27 PM
BLD02-00442 BLD-Framing/Rough-in8/1/20028/2/20028/2/2002 12:00:00 AMAFAIL
STEVEN ; Phone #: ###-#### C/N--Final not framing--Provide prior c/notice--recall. 8/2/2002 8:54:30 AM
BLD02-01649 BLD-Footing8/1/20028/2/20028/2/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/01/2002 at 14:15:15. Contact: ###-####. Foundation wall on master bed/bath --wip--and wip on footing on garage extension. 8/2/2002 9:21:23 AM
BLD02-01530 BLD-Framing/Rough-in8/1/20028/2/20028/2/2002 12:00:00 AMANR
###-#### shear--contractor rescheduled for pm 8/2/2002 10:17:50 AM
BLD02-00654 BLD-Framing/Rough-in8/1/20028/2/20028/2/2002 12:00:00 AMPPART
; Phone #: ###-#### C/N posted--ok to insulate. 8/2/2002 3:17:53 PM
BLD02-01515 BLD-Framing/Rough-in8/1/20028/2/20028/2/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/01/2002 at 13:58:26. Contact: ###-####. C/N--Ok to insulate. 8/2/2002 3:38:21 PM
BLD02-01144 BLD-Framing/Rough-in8/2/20028/2/20028/2/2002 12:00:00 AMPPART
###-#### terry ###-#### terryok to cover out side clearifacation of 43 ft of sheer and hold dwns in garage wall for bearing truss needed at framing. 8/2/2002 1:29:07 PM
BLD02-01530 BLD-Other8/2/20028/2/20028/2/2002 12:00:00 AMPFAIL
C/N on site--at mechanical area. 8/2/2002 3:37:27 PM
BLD02-01659 BLD-Foundation8/2/20028/2/20028/2/2002 12:00:00 AMPPART
wes; Phone #: ###-#### wip--80% ready--rebar in place. 8/2/2002 1:07:23 PM
BLD02-01290 BLD-Energy code compliance8/2/20028/2/20028/2/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/02/2002 at 09:19:57. Contact: ###-####. Insulation needed rear of house by patio or board up to prevent blow in from leaving and going onto patio soffit. Complete winder stair correction. 8/2/2002 3:05:17 PM
BLD02-00442 BLD-Final8/2/20028/2/20028/2/2002 12:00:00 AMPPASS
TROY ###-#### C. of C. #23296 issued. 8/2/2002 2:30:10 PM
MEC02-02059 Rough-in8/2/20028/2/20028/2/2002 12:00:00 AMPFAIL
RANDY; Phone #: ###-#### C/N--Also verbally informed builder and mech. contractor what needed to be done. $42.00 re-inspection fee issued. 8/2/2002 2:33:19 PM
BLD01-02890 BLD-Final8/2/20028/2/20028/2/2002 12:00:00 AMPFAIL
###-#### C/N on site 8/2/2002 1:40:58 PM
BLD01-03038 BLD-Final8/2/20028/2/20028/2/2002 12:00:00 AMPFAIL
###-#### C/N on site. 8/2/2002 1:42:52 PM
MEC02-01256 Final8/1/20028/2/20028/1/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/01/2002 at 15:26:26. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/01/2002 at 16:23:27.