FIR04-00405
| INSP-Sprinkler Rough-in | 7/30/2004 | 8/2/2004 | 8/2/2004 12:00:00 AM | A | PART |
|
|
Glen; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Okay to cover main entry area - the SSU was replaced with a SSP in thecanopy as the SSU would be obstructed 8/2/2004 10:42:41 AM
|
BLD04-00988
| FIRE-Final Inspection | 7/30/2004 | 8/2/2004 | 8/2/2004 12:00:00 AM | A | PASS |
|
|
MARTY; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIR04-00428
| INSP-Sprinkler Rough-in/Hydro | 7/30/2004 | 8/2/2004 | 8/2/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/30/2004 at 3:21:42 PM. Third floor - as many as 4 heads off one inch in two areas; many areas with three heads and nearly all with two heads off one inch; provide calc's for verification or separation per note #8 in plan review 8/2/2004 2:24:01 PM
|
FIR03-00343
| INSP-Final Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 12:00:00 AM | A | FAIL |
|
|
Pump pressure not reaching set pressure as reflected at the controlloer (130 psi) 8/2/2004 11:03:55 AM
|
FIR03-00613
| INSP-Final Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 12:00:00 AM | A | FAIL |
|
|
Need updated map to reflect proper location of M1-013 8/2/2004 10:52:06 AM
|
FIR03-00613
| INSP-Final Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 12:00:00 AM | A | FAIL |
|
|
Need updated map to reflect proper location of M1-013 8/2/2004 10:52:06 AM
|
BLD02-00199
| FIRE-Final Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 12:00:00 AM | A | FAIL |
|
|
Need knox box; address number on Broadway to have Front street added 8/2/2004 10:51:10 AM
|
FIR03-00343
| INSP-Final Inspection | 7/30/2004 | 8/2/2004 | 8/2/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/30/2004 at 7:46:45 AM. Contact: ###-####. Need updated to reflect the correct location of M1-013 8/2/2004 10:44:42 AM
|
FIR04-00268
| INSP-Final Inspection | 7/30/2004 | 8/2/2004 | 8/2/2004 12:00:00 AM | P | PART |
|
|
Contact: Brian ; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Okay to cover; will close out this permit at building final - need escutcheons and sprinkler is overdue annual inspection 8/2/2004 2:53:10 PM
|
BLD04-00138
| FIRE-Final Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 12:00:00 AM | P | FAIL |
|
|
Shawn -- building closes at 4:00. ; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Fire/life safety okay; Extended coverage sprinkler heads are used on classrooms - spacing okay; sprinkler heads overspaced at new wall/door in corridor - over 8 ft from new wall 8/2/2004 3:35:31 PM
|