Inspections for the day of: Wednesday, August 2, 2006.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01532 BLD-Aging Inspection8/2/20068/2/20068/8/2006 9:06:55 AM DEFR
BLD03-01020 BLD-Aging Inspection8/2/20068/2/20068/8/2006 9:04:53 AM DEFR
FIR06-00337 INSP-Sprinkler Rough-in8/1/20068/2/20068/3/2006 2:33:20 PMAPART
Rough-in at the drop ceiling areas in the chemical lab are good for cover, final pending inspection for the remainder of relocated heads in the adjacent cleanroom.
FIR06-00258 INSP-Final Inspection8/1/20068/2/20068/3/2006 12:56:05 PMAFAIL
Notification device in the library is missing.
BLD05-02001 FIRE-Final Inspection8/2/20068/2/20068/3/2006 11:23:08 AMPFAIL
Fire dept. access lane marking does not meet requirements of current resubmitted approved plans, extend curb painting and hatched no parking stripes as discussed and indicated per plan.
BLD05-03139 FIRE-Final Inspection8/2/20068/2/20068/3/2006 10:39:47 AMPPASS
Life safety field inspection passed.
FIR05-00632 INSP-Final Inspection8/2/20068/2/20068/2/2006 4:50:11 PMAPASS
Fire alarm work passed field inspection, updated map posted and incorrect PS descriptor changed while on site.
FIR06-00210 INSP-Final Inspection8/1/20068/2/20068/2/2006 3:28:21 PMAPASS
Final inspection passed permit finaled.
FIR05-00451 FIR-Aging Inspection8/2/20068/2/20068/2/2006 1:39:41 PM DEFR
FIR06-00355 INSP-Sprinkler Rough-in8/1/20068/2/20068/2/2006 1:38:00 PMPCANC
Notified contractor to final aging permits on the same building prior to request for inspeciton on additional new permits.
FIR06-00357 INSP-Sprinkler Rough-in8/1/20068/2/20068/2/2006 1:36:26 PMPCANC
Notified contractor to final aging permits on the same building prior to request for inspection on additional new permits.
FIR06-00322 INSP-Sprinkler Rough-in8/1/20068/2/20068/2/2006 1:35:09 PMPCANC
Notified contractor to final aging permits on the same building prior to request for inspections on additional new permits.
BLD06-02078 FIRE-Final Inspection8/2/20068/2/20068/2/2006 1:33:09 PMPPASS
Final life safety inspection passed.
BLD06-00242 FIRE-Final Inspection8/2/20068/2/20068/2/2006 1:09:23 PMPPASS
Inspection passed, no card available on site for signature.
FIR06-00494 INSP-Final Inspection8/2/20068/2/20068/2/2006 12:44:06 PMPFAIL
HVAC duct detector incorrectly reports as alarm condition and is not identified correctly at remote station monitoring.
FIR06-00490 INSP-Final Inspection8/2/20068/2/20068/2/2006 12:40:35 PMAPASS
Fire sprinkler work passed field inspection, noted display cabinets blocking hose station to be relocated.
BLD06-00863 FIRE-Final Inspection8/1/20068/2/20068/2/2006 12:10:39 PMAFAIL
The project related fire alarm work failed inspection, also need to remove the keyed locking hardware at the door from office area.
BLD05-02453 FIRE-Final Inspection8/1/20068/2/20068/2/2006 11:19:56 AMAPASS
Required correction for the fire dept. access curb painting has been verified for completion, final inspection passed.
FIR06-00487 INSP-Sprinkler Rough-in/Hydro8/1/20068/2/20068/2/2006 10:44:01 AMAPART
Hydrostatic test for the new rack sprinklers at three areas is satisfactory, items on previous c/n have been verified for completion, added sprinklers at halo above the mountain are acceptable. Need to perform forward flow, test new tampers at the backflow, noted the ball drip at the FDC is leaking.
BLD06-02078 FIRE-Final Inspection8/1/20068/2/20068/2/2006 10:00:28 AMAPART
Items on previous correction notice have been completed, smoke evac system did not pass functional test.
FIR06-00547 INSP-Final Inspection7/31/20068/2/20068/2/2006 9:57:25 AMAPASS
Fire sprinkler passed final inspection.