FIR11-00319
| INSP-Final Inspection | 8/2/2011 | 8/2/2011 | 8/2/2011 5:02:00 PM | P | PASS |
|
|
Verified plan modification and previous C/N items.
|
FIR11-00269
| INSP-Final Inspection | 8/1/2011 | 8/2/2011 | 8/2/2011 5:00:51 PM | P | PASS |
|
|
Scope of fire alarm work passed functional testing. Permit finaled.
|
BLD10-01578
| FIRE-Alarm Testing | 8/2/2011 | 8/2/2011 | 8/2/2011 4:59:39 PM | P | NR |
|
|
See red-lined notes on approved fire alarm plans for details.
|
BLD11-01354
| FIRE-Conference | 8/2/2011 | 8/2/2011 | 8/2/2011 4:58:29 PM | P | DONE |
|
|
Regarding scope of work and site inspection schedule.
|
FIR11-00342
| INSP-Sprinkler Rough-in/Hydro | 8/2/2011 | 8/2/2011 | 8/2/2011 4:57:40 PM | A | PART |
|
|
SW heads at the entry vestibule have been changed to pendents. New arm-overs and drops okayed for cover.
|
FIR11-00186
| INSP-Conference | 8/2/2011 | 8/2/2011 | 8/2/2011 1:42:30 PM | A | DONE |
|
|
Regarding after hours inspection request 8/9 AM.
|
FIR11-00286
| INSP-Final Inspection | 8/2/2011 | 8/2/2011 | 8/2/2011 1:40:48 PM | A | PASS |
|
|
Scope of work completed. Site inspection finished 6/22 by T. Frost. Permit finaled.
|
BLD11-01627
| FIRE-Conference | 8/2/2011 | 8/2/2011 | 8/2/2011 1:37:48 PM | A | DONE |
|
|
Conversation with owner and architect regarding fire code review notes, key notes per plan, fire alarm and sprinkler work, correction items, etc.
|