FIR11-00095
| INSP-Sprinkler Rough-in/Hydro | 8/2/2011 | 8/2/2011 | 8/2/2011 4:21:05 PM | P | PASS |
|
|
First floor office piping is ok to cover.
|
FIR11-00212
| INSP-Sprinkler Rough-in/Hydro | 8/2/2011 | 8/2/2011 | 8/2/2011 4:18:35 PM | P | PASS |
|
|
Hydro test passed. Second floor piping can be covered.
|
BLD11-01420
| FIRE-Final Inspection | 8/1/2011 | 8/2/2011 | 8/2/2011 12:45:11 PM | A | FAIL |
|
|
Mount all fire extinguishers between 5' and 4" AFF, Provide annual inspection for all fire extinguishers, Remove the thumbturn deadbolts from all exterior doors and provide single action type of hardware. The main exit can be keyed as per notes. Coordinate with plan review on exiting requirements, provide emergency lighting in the south retail area and repair the light in the center retail area.
|
FIR11-00204
| INSP-Final Inspection | 8/1/2011 | 8/2/2011 | 8/2/2011 11:27:31 AM | A | PASS |
|
|
permit passed
|
FIR11-00331
| INSP-Final Inspection | 8/2/2011 | 8/2/2011 | 8/2/2011 11:27:08 AM | A | PASS |
|
|
permit passed
|