PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, August 2, 2011
.
Number of inspections:
14
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC11-00347
General Inspection
8/2/2011
8/2/2011
8/2/2011 4:13:07 PM
PASS
ESC11-00386
Site Preparation
7/27/2011
8/2/2011
8/2/2011 3:57:26 PM
A
NR
ESC10-00850
General Inspection
8/2/2011
8/2/2011
8/2/2011 3:56:31 PM
P
FAIL
Verbal to RP:
Due to inactivty of the sub division developement. 14 days from today the site must be begin to temporarly stabilize or perminately stabilize all disturbed soil. Placed a call into the RP over the schedule. Will re-inspect on 8/20/2011 being 14 work calender days from todays date.
ESC11-00141
Site Preparation
7/27/2011
8/2/2011
8/2/2011 2:33:51 PM
A
FAIL
Must provide a valid RP within 24hrs. If not provided within the 24hrs, a stop work order will be issued. Will re-inspect on 8//3/2011PM
ESC11-00334
General Inspection
8/2/2011
8/2/2011
8/2/2011 2:20:41 PM
PASS
ESC11-00519
Tracking Control
7/29/2011
8/2/2011
8/2/2011 12:51:31 PM
A
PASS
ESC11-00415
Site Preparation
8/2/2011
8/2/2011
8/2/2011 10:26:41 AM
A
FAIL
Message to RP:
Fill out the yellew ESC sign with all the proper information. Will re-inspect on 8/5/2011am.
ESC11-00184
Conference
7/29/2011
8/2/2011
8/2/2011 10:23:52 AM
A
FAIL
Verbal to RP:
Clean up all hard surface of all sediment and debris on a daily basis. Will follow up on 8/4/2011.
ESC11-00223
Conference
7/28/2011
8/2/2011
8/2/2011 10:23:20 AM
A
FAIL
Verbal to RP:
Clean up all hard surface of all sediment and debris on a daily basis. Will follow up on 8/4/2011.
ESC11-00102
General Inspection
8/2/2011
8/2/2011
8/2/2011 8:44:36 AM
A
FAIL
Due to inactivty of the sub division developement. 14 days from today the site must be begin to temporarly stabilize or perminately stabilize all disturbed soil. Placed a call into the RP over the schedule. Will re-inspect on 8/20/2011 being 14 work calender days from todays date.
ESC11-00415
Site Preparation
8/1/2011
8/2/2011
8/2/2011 8:37:23 AM
A
CANC
Duplicate
ESC11-00525
General Inspection
8/2/2011
8/2/2011
8/2/2011 8:36:53 AM
NR
Placed a call in with RP to inform when the project will begin.
ESC11-00020
General Inspection
8/2/2011
8/2/2011
8/2/2011 8:34:03 AM
DONE
Permit filaled.
ESC11-00020
DOC - Permit Finaled
8/2/2011
8/2/2011
8/2/2011 8:33:35 AM
P
PASS