BLD12-00169
| BLD-Final | 8/1/2012 | 8/2/2012 | 8/2/2012 4:15:57 PM | P | NR |
|
|
Please call me approx 1 hr before scheduled inspection if at all possible. Will be finalling out 3 projects today. Thank you very much! Chris Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD12-01007
| BLD-Other | 8/2/2012 | 8/2/2012 | 8/2/2012 3:00:33 PM | P | PASS |
|
|
Fire Protected Soffit inspection Phone #: ###-#### >> Inspection requested via web by Josh Edwards
|
ESC12-00057
| Site Final | 8/2/2012 | 8/2/2012 | 8/2/2012 2:30:19 PM | P | PASS |
|
|
|
BLD12-00143
| BLD-Final | 8/2/2012 | 8/2/2012 | 8/2/2012 2:29:22 PM | P | DONE |
|
|
Garage code is 1968. plans by furnace Phone #: ###-#### >> Inspection requested via web by John Dyche
|
BLD12-01336
| BLD-Framing/Rough-in | 8/2/2012 | 8/2/2012 | 8/2/2012 2:10:26 PM | P | PART |
|
|
Dave Phone #: ###-#### ok after mech insp
|
BLD12-01336
| BLD-Wall Bracing | 8/2/2012 | 8/2/2012 | 8/2/2012 2:08:39 PM | P | PASS |
|
|
Dave Phone #: ###-####
|
ESC12-00331
| Random Inspection | 8/2/2012 | 8/2/2012 | 8/2/2012 1:45:12 PM | A | PASS |
|
|
|
BLD12-00762
| BLD-Wall Bracing | 8/1/2012 | 8/2/2012 | 8/2/2012 1:44:41 PM | A | PASS |
|
|
Shear wall -- Josh Phone #: ###-####
|
BLD12-00771
| BLD-Final | 8/1/2012 | 8/2/2012 | 8/2/2012 1:14:30 PM | A | NR |
|
|
andy Phone #: ###-####
|
BLD12-00824
| BLD-Wall Bracing | 8/1/2012 | 8/2/2012 | 8/2/2012 10:49:43 AM | A | PASS |
|
|
Shear wall -- CJ Phone #: ###-####
|
GCB12-00009
| GCB-Ceiling Grid | 8/1/2012 | 8/2/2012 | 8/2/2012 10:22:59 AM | A | PASS |
|
|
Dave @ ###-#### Annex Side (E) of Project east side ok
|
ESC12-00449
| Random Inspection | 8/2/2012 | 8/2/2012 | 8/2/2012 9:52:10 AM | A | PASS |
|
|
|
ESC12-00708
| Site Preparation | 8/2/2012 | 8/2/2012 | 8/2/2012 9:40:45 AM | P | PASS |
|
|
|
BLD12-01801
| BLD-Footing | 8/2/2012 | 8/2/2012 | 8/2/2012 9:36:53 AM | A | PASS |
|
|
Phone #: 6951097 >> Inspection requested via mobile web by adam
|
BLD10-02069
| BLD-Conference | 8/2/2012 | 8/2/2012 | 8/2/2012 9:11:50 AM | A | PASS |
|
|
Lower Level Ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Scott Greer ok 408
|
MIS12-00223
| Set Bond Amount | 8/2/2012 | 8/2/2012 | 8/2/2012 12:00:00 AM | | DONE |
|
|
set bond amt for demo of SFD..$4000.00 demo bond required.
|