ESC12-00739
| Site Preparation | 8/2/2012 | 8/2/2012 | 8/13/2012 9:10:27 AM | P | PEND |
|
|
|
BLD09-01311
| BLD-Aging Inspection | 8/2/2012 | 8/2/2012 | 8/10/2012 10:59:47 AM | | FAIL |
|
|
|
BLD09-00929
| BLD-Aging Inspection | 8/2/2012 | 8/2/2012 | 8/10/2012 9:02:13 AM | | PASS |
|
|
|
BLD10-02133
| DOC - Permit Expired | 8/1/2012 | 8/2/2012 | 8/7/2012 9:22:14 AM | P | PASS |
|
|
|
MIS12-00221
| BLD-Conference | 8/2/2012 | 8/2/2012 | 8/2/2012 3:33:28 PM | P | PASS |
|
|
Tim Phone #: ###-####,, recomend a $4000 bond
|
BLD12-01338
| BLD-Energy code compliance | 8/2/2012 | 8/2/2012 | 8/2/2012 3:16:16 PM | P | PASS |
|
|
Peter Phone #: ###-####
|
BLD12-01026
| BLD-Final | 7/31/2012 | 8/2/2012 | 8/2/2012 2:16:58 PM | A | NR |
|
|
Ryan Phone #: ###-####,, needs a final on zoning 1st
|
ESC12-00363
| Site Final | 7/31/2012 | 8/2/2012 | 8/2/2012 2:15:22 PM | P | PASS |
|
|
|
BLD12-01751
| BLD-Final | 7/31/2012 | 8/2/2012 | 8/2/2012 1:58:05 PM | P | NR |
|
|
|
BLD12-01334
| BLD-Foundation | 7/30/2012 | 8/2/2012 | 8/2/2012 1:57:02 PM | P | NR |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD12-01786
| BLD-Final | 8/2/2012 | 8/2/2012 | 8/2/2012 1:54:06 PM | P | NR |
|
|
Brandon Phone #: ###-####,, on site look at sheeting,, ok to relace as needed and the cover with new roof
|
MIS12-00104
| DOC - Permit Finaled | 8/2/2012 | 8/2/2012 | 8/2/2012 1:08:11 PM | P | PASS |
|
|
permit was issued
|
BLD12-01660
| BLD-Conference | 8/1/2012 | 8/2/2012 | 8/2/2012 12:57:27 PM | P | PART |
|
|
call before//Lucas Garcia Phone #: ###-####,, general ?s,, will need egress in bedroom upstairs if the window is changed out per policy
|
MIS12-00091
| DOC - Permit Finaled | 8/2/2012 | 8/2/2012 | 8/2/2012 12:34:52 PM | P | PASS |
|
|
|
BLD09-00136
| BLD-Conference | 8/1/2012 | 8/2/2012 | 8/2/2012 12:01:11 PM | A | PART |
|
|
John Phone #: ###-####,, roof issues,, will meet at the office to talk to plan review
|
BLD12-00739
| BLD-Framing/Rough-in | 8/1/2012 | 8/2/2012 | 8/2/2012 11:34:55 AM | A | FAIL |
|
|
Dave-Shear nail inspection please--Please call at least 15-30 mins prior to inspection Phone #: ###-####,, ok to cover roof,,, need to nail or staple shear/brace per plan,, 3/8" away from edges,, flush nail,, nail double studs above hold downs,, space nailing on shear plan is a maximum distance between fasteners
|
BLD11-02821
| BLD-Final | 7/31/2012 | 8/2/2012 | 8/2/2012 10:56:31 AM | A | DONE |
|
|
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO
|
BLD11-02821
| DOC - Permit Finaled | 8/2/2012 | 8/2/2012 | 8/2/2012 10:54:01 AM | P | PASS |
|
|
c of o issued
|
ESC11-00641
| Site Final | 8/1/2012 | 8/2/2012 | 8/2/2012 10:49:41 AM | A | PASS |
|
|
|
BLD12-01908
| BLD-Foundation | 8/1/2012 | 8/2/2012 | 8/2/2012 12:00:00 AM | A | CANC |
|
|
Chris Phone #: ###-####
|