Inspections for the day of: Thursday, August 2, 2012.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00722 Site Preparation8/2/20128/2/20128/6/2012 8:26:17 AM NR
ESC12-00054 Aging Inspection8/2/20128/2/20128/2/2012 3:30:41 PM DONE
Permit finaled.
ESC12-00054 DOC - Permit Finaled8/2/20128/2/20128/2/2012 3:30:32 PMPPASS
ESC11-00599 General Inspection8/2/20128/2/20128/2/2012 3:30:11 PM PASS
ESC11-00601 General Inspection8/2/20128/2/20128/2/2012 3:29:54 PM CANC
ESC09-00352 General Inspection8/2/20128/2/20128/2/2012 11:26:51 AM PART
Comppleting minor landscaping irragation lines surrounding the two ponds.
ESC11-00091 General Inspection8/2/20128/2/20128/2/2012 11:26:00 AM PASS
Work is mostly complete. Waiting on the BLD to be finaled.
ESC11-00627 General Inspection8/2/20128/2/20128/2/2012 11:24:38 AM PASS
ESC11-00176 Tracking Control8/2/20128/2/20128/2/2012 8:38:50 AMAFAIL
Final Verbal to RP:
IF violation is not corrected within the given timeframe, a STOP WORK ORDER will be posted.

Clean up all sediment off of the hard surfaces and clean up on a daily basis by the end of the work day. Will re-inspect on 8/3/2012am.
ESC11-00004 General Inspection8/2/20128/2/20128/2/2012 7:47:14 AM PASS