FIR13-00307
| INSP-Final Inspection | 7/31/2013 | 8/2/2013 | 8/6/2013 3:37:23 PM | A | DEFR |
|
|
Devices installed per plans and tested ok. The issue is the two new visual devices are the only visual devices in a large open office space that currently only has audible signals. Per the fire alarm contractor an "upgrade agreement" exists for this building. I have deferred approval to Scott Arellano/Fire Dept.
|
FIR06-00015
| INSP-Final Inspection | 8/2/2013 | 8/2/2013 | 8/2/2013 3:32:17 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00305
| INSP-Sprinkler Rough-in | 8/2/2013 | 8/2/2013 | 8/2/2013 3:28:20 PM | P | PART |
|
|
rough-in passed. As-builts are needed prior to a final sign off that show theactual pipe routing. Piping can not be covered until a tenting inspection has been performed. Also the underground supply is a combined service with the domestic which, as noted on the city approved plans/notes, is not United Water approved.
|
BLD13-01603
| FIRE-Final Inspection | 8/1/2013 | 8/2/2013 | 8/2/2013 1:29:28 PM | A | PASS |
|
|
Life safety passed
|
FIR13-00304
| INSP-Final Inspection | 8/2/2013 | 8/2/2013 | 8/2/2013 1:28:52 PM | P | PASS |
|
|
Permit finaled
|
BLD13-02030
| FIRE-Final Inspection | 8/1/2013 | 8/2/2013 | 8/2/2013 11:14:36 AM | A | PASS |
|
|
Life safety passed.
|
FIR13-00256
| INSP-Final Inspection | 8/1/2013 | 8/2/2013 | 8/2/2013 11:12:11 AM | A | PASS |
|
|
Permit finaled
|
FIR13-00314
| INSP-Sprinkler Rough-in | 8/1/2013 | 8/2/2013 | 8/2/2013 10:18:04 AM | A | PASS |
|
|
The supply piping that was installed as 1" has been correct to match the required 1 1/4". The piping in the restroom walls can now be covered.
|
FIR12-00199
| INSP-Final Inspection | 7/31/2013 | 8/2/2013 | 8/2/2013 9:36:14 AM | A | PASS |
|
|
Permit finaled
|
FIR13-00126
| INSP-Alarm Testing | 8/1/2013 | 8/2/2013 | 8/2/2013 7:13:01 AM | A | DONE |
|
|
Alarm testing for Prep/Rec 103/104 and the west entry passed.
|