Inspections for the day of: Friday, August 2, 2013.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE12-01799 Electrical Rough-In8/1/20138/2/20138/2/2013 3:24:57 PMPPASS
inspection for trench to wire poles. Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover parking lot trenches for poles bases, but not with in five feet of pole base, monument sign or stub-up
ELE13-00984 Conference8/1/20138/2/20138/2/2013 2:49:41 PMPDONE
john Phone #: ###-#### Discuss with homeowner electrical requirements for a hot tub.
ELE13-01253 Final8/1/20138/2/20138/2/2013 2:08:40 PMPFAIL
Jim Phone #: ###-####-Please call for access information House address incorrect, Need at least 50% CFL in lighting fixture or energy code, kitchen plate missing
ELE13-01050 Electrical Rough-In8/1/20138/2/20138/2/2013 1:43:02 PMPPASS
1st floor ceiling inspection -contact is John Dillon Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in cover cafeteria ceiling grid, except first row from hallway
ELE13-01194 Rough-In Permanent Service8/1/20138/2/20138/2/2013 1:05:20 PMPPASS
please inspect 200amp overhead service change. Hopefully early afternoon(no big deal if not) so we can call Idaho Power to energize the service. I know its crazy busy right now. thx Phone #: ###-#### >> Inspection requested via web by Scott Davis p/s o/h rec ok
ELE13-01977 Rough-In Permanent Service8/2/20138/2/20138/2/2013 12:46:29 PMAPASS
Need service inspect and we need to cover the inside.
Thanks, Greg Phone #: ###-#### >> Inspection requested via web by Greg Idsinga rough-in p/s o/h n ok
ELE13-01990 Final8/1/20138/2/20138/2/2013 10:47:18 AMAFAIL
Hot Tub Phone #: ###-#### >> Inspection requested via web by steve ragan Bussing location in meter main only allows 50 ampere ocver current, Remove bonding jumper scew from neutral in hot tub disconnect.
ELE13-02026 Final8/2/20138/2/20138/2/2013 9:55:28 AMAPASS
Please inspect living room lights. All living room lights, including the light over the counter by the cook-top are new. Phone #: ###-#### >> Inspection requested via web by nathan palmer job complete final ok
ELE13-02036 Electrical Rough-In8/1/20138/2/20138/2/2013 9:43:36 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot rough-in ok cover addition
ELE13-00086 Electrical Rough-In8/1/20138/2/20138/2/2013 9:09:02 AMPPASS
2nd floor ceiling cover. Phone #: ###-#### >> Inspection requested via web by Buster Bowen rough-in ok cover ceiling from D line north
ELE13-00498 Electrical Rough-In8/1/20138/2/20138/2/2013 8:52:27 AMAPASS
Under floor inspection for room RD 573, Corridor 585, and EMS 574 please. The contact name will be Andy. Thank You. Phone #: ###-#### >> Inspection requested via web by Deb Gooden rough-in ok
ELE13-01766 Electrical Rough-In8/1/20138/2/20138/2/2013 8:29:03 AMAPASS
this is for a ceiling cover in all areas, please give corey a heads up call 1/2 hour in advance so he can meet you over there for a walk thru. Phone #: ###-#### >> Inspection requested via web by Don Lustig rough-in ok cover ceiling grid
ELE13-01271 Electrical Rough-In8/1/20138/2/20138/2/2013 8:12:07 AMAPASS
Underground-Dirk Phone #: ###-#### rough-in ok cover southwest corner, completes parking lot underground