MIS16-00138
| MIS-Aging Inspection | 8/2/2016 | 8/2/2016 | 8/3/2016 8:10:32 AM | | DONE |
|
|
|
MIS15-00196
| MIS-Aging Inspection | 8/2/2016 | 8/2/2016 | 8/3/2016 8:09:49 AM | | PEND |
|
|
|
BLD16-00680
| BLD-Conference | 8/2/2016 | 8/2/2016 | 8/2/2016 4:52:04 PM | P | NH |
|
|
RC Phone #: ###-####
|
MIS16-00237
| BLD-Conference | 8/1/2016 | 8/2/2016 | 8/2/2016 4:51:41 PM | A | PEND |
|
|
Possbily turning garage, 5888 Gary Lane, into an ADU without permits. Owner trying to get new trash account with UB. /// correction notice posted to obtain permits or justify
|
BLD16-01081
| BLD-Final | 8/2/2016 | 8/2/2016 | 8/2/2016 4:50:07 PM | P | PASS |
|
|
would like call ahead; Tom Phone #: ###-####
|
BLD16-01081
| DOC - Permit Finaled | 8/2/2016 | 8/2/2016 | 8/2/2016 4:28:55 PM | P | PASS |
|
|
c of o issued
|
MIS16-00238
| BLD-Conference | 8/2/2016 | 8/2/2016 | 8/2/2016 4:08:54 PM | A | PART |
|
|
Possible addition/remodel being done without a permit,, gave owner a c/notice,, he may just be removing some walls for a patio area.. he will see plan review prior to any more work
|
MIS16-00236
| BLD-Final | 8/1/2016 | 8/2/2016 | 8/2/2016 3:48:32 PM | A | DEFR |
|
|
possible work being done in kitchen area-not basement-there is a permit for the basement
|
BLD16-02368
| BLD-Conference | 8/2/2016 | 8/2/2016 | 8/2/2016 3:47:07 PM | P | PEND |
|
|
status review,, ok to continue per hillside public works,, JT
|
BLD16-01511
| BLD-Wall Bracing | 8/1/2016 | 8/2/2016 | 8/2/2016 3:33:48 PM | P | NR |
|
|
David Phone #: ###-####
|
BLD16-01196
| BLD-Final | 8/2/2016 | 8/2/2016 | 8/2/2016 3:33:08 PM | P | DONE |
|
|
Barrie Phone #: ###-####
|
BLD16-01196
| DOC - Permit Finaled | 8/2/2016 | 8/2/2016 | 8/2/2016 3:33:02 PM | P | PASS |
|
|
|
BLD15-04063
| BLD-Wall cover | 8/2/2016 | 8/2/2016 | 8/2/2016 3:32:38 PM | P | PART |
|
|
Insulation Inspection for Pre-Rock at L1 Corridors. Phone #: ###-#### Inspection requested via web by Joshua Folger
|
BLD15-04063
| BLD-Framing/Rough-in | 8/1/2016 | 8/2/2016 | 8/2/2016 3:32:17 PM | P | PART |
|
|
This inspection will be for acceptance of framing in the electrical room in order to insulate and drywall perimeter walls and ceiling; to allow expediting permanent power installation of switch gear and distribution panels. Phone #: ###-#### Inspection requested via web by Joshua Folger,, this room ok
|
BLD16-02163
| BLD-Final | 8/1/2016 | 8/2/2016 | 8/2/2016 3:31:50 PM | P | DONE |
|
|
Final can be done at anytime. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD16-02163
| DOC - Permit Finaled | 8/2/2016 | 8/2/2016 | 8/2/2016 3:31:42 PM | P | PASS |
|
|
done
|
BLD15-03925
| BLD-Framing/Rough-in | 8/1/2016 | 8/2/2016 | 8/2/2016 3:30:31 PM | A | DEFR |
|
|
Charlie Phone #: ###-####
|
BLD15-03350
| BLD-Final | 8/2/2016 | 8/2/2016 | 8/2/2016 3:14:17 PM | P | PASS |
|
|
call for access; Clive Phone #: ###-####
|
BLD15-03350
| DOC - Permit Finaled | 8/2/2016 | 8/2/2016 | 8/2/2016 3:13:15 PM | P | PASS |
|
|
c of o issued
|
BLD16-01550
| BLD-Framing/Rough-in | 8/1/2016 | 8/2/2016 | 8/2/2016 3:12:25 PM | A | PART |
|
|
Grant Phone #: ###-####,, c/n posted,, ok to insulate
|
BLD16-02561
| BLD-Footing | 8/1/2016 | 8/2/2016 | 8/2/2016 12:37:17 PM | A | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD16-02027
| BLD-Energy code compliance | 8/1/2016 | 8/2/2016 | 8/2/2016 12:31:21 PM | A | PASS |
|
|
Matt Phone #: ###-####
|
BLD16-01181
| BLD-Foundation | 8/1/2016 | 8/2/2016 | 8/2/2016 12:14:12 PM | A | DONE |
|
|
For the garage // Will Phone #: ###-####
|
BLD15-04063
| BLD-Wall cover | 8/2/2016 | 8/2/2016 | 8/2/2016 12:00:26 PM | A | PART |
|
|
Insulation Inspection for Pre-Rock at L1 Corridors. Phone #: ###-#### Inspection requested via web by Joshua Folger,, electrical room ok
|
BLD16-00680
| BLD-Conference | 8/1/2016 | 8/2/2016 | 8/2/2016 11:37:17 AM | A | DEFR |
|
|
RC Phone #: ###-####,, defr to pm
|
BLD15-03350
| BLD-Final | 8/1/2016 | 8/2/2016 | 8/2/2016 11:36:14 AM | A | DEFR |
|
|
call for access; Clive Phone #: ###-####,, defr to pm
|