Inspections for the day of: Friday, August 2, 2019.
Number of inspections: 1
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-02718 Conference8/2/20198/2/20198/2/2019 4:22:40 PMPDONE
Would like to have a consultation with inspector Daryl about a commercial paint booth Phone #: ###-#### Inspection requested via web by Keith Chetta Discussed with Electrical contractor requirements of NEC 110.3 Listing and Labling of spray booth and spray booth equipment through third party testing company or an Electrical Engineer signing off and giving area classification. Wiring methods compliant with NEC Article 516