Inspections for the day of: Monday, August 20, 2001.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00892 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM NR
no further call 8/20/2001 10:25:04 AM
BLD01-00711 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM NR
BLD01-01322 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PART
wip 8/20/2001 10:26:46 AM
BLD01-01407 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PART
wip? 8/20/2001 10:25:44 AM
BLD01-01076 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM NR
had conf w/ Randall w/ Simplot re wood used in space; wip. 8/20/2001 10:23:36 AM
BLD01-01633 BLD-Framing/Rough-in8/16/20018/20/20018/20/2001 12:00:00 AMAPART
r/i -for corridor-- chris -###-#### verbal c/n to complete firestops,add fasteners at gyp edges 8/20/2001 3:05:42 PM 8/20/2001 3:05:44 PM ok to rock;need clarify hvac/shaft penetrations 8/20/2001 3:06:14 PM
BLD01-00531 BLD-Conference8/17/20018/20/20018/20/2001 12:00:00 AMAPASS
###-#### scott tre fireblocks, firestops at loft party walls, rock both sides truss to deck 8/20/2001 11:47:25 AM
BLD01-01013 BLD-Final8/17/20018/20/20018/20/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/17/2001 at 11:35:13. Contact: ###-####...need elec ok 8/20/2001 10:21:50 AM
BLD00-03185 BLD-Conference8/19/20018/20/20018/20/2001 12:00:00 AMAPASS
meet w/ Tony please 8/19/2001 11:09:33 PM keep c/n, no occupancy til reinsp ok'd by fire 8/20/2001 9:53:00 AM
BLD01-01365 BLD-Conference8/20/20018/20/20018/20/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 8/20/2001 9:15:38 AM keep c/n, need reinsp. plans onsite
BLD01-01364 BLD-Conference8/20/20018/20/20018/20/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 8/20/2001 9:14:56 AM w/ insulator, keep c/n, need reinsp
BLD01-01122 BLD-Conference8/20/20018/20/20018/20/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 8/20/2001 10:12:39 AM w/ owner...need elec insp/final, ok to continue.
BLD01-000-1 BLD-Conference8/20/20018/20/20018/20/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 8/20/2001 11:45:52 AM w/ bldr & hvac...box joist bays to equal 1hr
BLD01-00595 BLD-Conference8/20/20018/20/20018/20/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 8/20/2001 3:49:53 PM w/ arch re fresh air & shear walls... need eng's letter.
BLD00-01657 BLD-Final8/20/20018/20/20018/20/2001 12:00:00 AMPFAIL
WALT ###-#### FN, c/n ok for t/o... 8/20/2001 4:41:10 PM
BLD00-01658 BLD-Final8/20/20018/20/20018/20/2001 12:00:00 AMPPASS
FN WALT ###-####
BLD00-00662 BLD-Final8/20/20018/20/20018/20/2001 12:00:00 AMPPASS
WALT ###-#### FN
BLD01-00280 BLD-Final8/20/20018/20/20018/20/2001 12:00:00 AMPPASS
WALT ###-#### FN
BLD01-00234 BLD-Wall cover8/20/20018/20/20018/20/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 08/20/2001 at 07:37:52. Contact: ###-####....need listing for gas outlet firestops, complete med gas r/i 8/21/2001 11:52:59 AM
BLD01-00594 BLD-Framing/Rough-in8/20/20018/20/20018/20/2001 12:00:00 AMPPART
FR JIM ###-#### 1st fl walk thru, & ok to add ins sheathing. Awaiting eng's ok for shear at 1st fl ok to continue. 8/20/2001 3:49:03 PM
BLD01-01707 BLD-Conference8/20/20018/20/20018/20/2001 12:00:00 AMPPASS
###-#### dave re deck/stairs; obtain c/o. 8/20/2001 5:33:13 PM