Inspections for the day of: Monday, August 20, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01207 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PART
wip 8/20/2001 4:40:26 PM
BLD01-00984 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PART
exp 10/14 8/20/2001 4:42:06 PM
BLD01-01360 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PART
exp 11/17 8/20/2001 4:47:48 PM
BLD01-01235 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PART
exp 11/6 8/20/2001 4:45:16 PM
BLD01-00720 BLD-Framing/Rough-in8/17/20018/20/20018/20/2001 12:00:00 AMAPART
frank ###-####. new garage ok, needs all reqd signatures for a final inspection for a temp oc. . other work at ext shop not yet ready.8/20/2001 9:55:46 AM 8/20/2001 9:56:15 AM
BLD01-01080 BLD-Final8/17/20018/20/20018/20/2001 12:00:00 AMAFAIL
Jerard ###-####.needs zoning and fire/life inspections also, vent at exterior landing and access to insp blocking.8/20/2001 10:23:47 AM t 8/20/2001 10:23:50 AM 8/20/2001 10:24:21 AM
BLD00-03194 BLD-Conference8/18/20018/20/20018/20/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/18/2001 at 08:24:01. Contact: ###-####.info for req of temp oc. 8/20/2001 11:01:59 AM
BLD00-02822 BLD-Final8/18/20018/20/20018/20/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 08/18/2001 at 15:45:47. Contact: ###-####.. needs all signatures on job card. 8/20/2001 3:49:21 PM
BLD00-02822 BLD-Final8/20/20018/20/20018/20/2001 12:00:00 AMACANC
Scheduled by Inspector: 407 On 8/20/2001 4:34:06 PM
BLD00-02631 BLD-Framing/Rough-in8/20/20018/20/20018/20/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/20/2001 at 08:33:40. Contact: ###-####.c/n posted at job trailer. 8/20/2001 3:34:32 PM
BLD01-01695 BLD-Concrete8/20/20018/20/20018/20/2001 12:00:00 AMPPART
###-#### jim. ok also subject to s-i . 8/20/2001 4:24:22 PM
BLD00-02822 BLD-Final8/20/20018/20/20018/20/2001 12:00:00 AMPCANC
###-#### john
BLD01-00220 BLD-Conference8/20/20018/20/20018/20/2001 12:00:00 AMPPART
Scheduled by Inspector: 407 On 8/20/2001 3:53:30 PM
BLD00-03194 BLD-Conference8/20/20018/20/20018/20/2001 12:00:00 AMPPART
Scheduled by Inspector: 407 On 8/20/2001 3:55:43 PM . went over the 1 hour stair corridor ,the walls will be continous up to the metal roof deck, and the need for a shaft to the skylight would not be required ,if acceptable to architect,also went over this with plan reveiw. 8/20/2001 3:59:46 PM