Inspections for the day of: Monday, August 20, 2001.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00705 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PART
exp 9/16/01 8/20/2001 12:25:24 PM
BLD00-03682 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PASS
wip 8/20/2001 11:54:37 AM
BLD00-02442 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PART
exp 9/16/01 8/20/2001 12:24:04 PM
BLD01-00679 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PART
exp. 9/15/01 8/20/2001 12:26:00 PM
BLD01-00475 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PASS
wip 8/20/2001 11:47:01 AM
BLD01-00537 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PASS
wip 8/20/2001 11:53:58 AM
BLD01-00146 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PASS
wip 8/20/2001 11:53:52 AM
BLD01-00683 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PASS
wip 8/20/2001 11:53:06 AM
BLD00-03319 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PASS
wip 8/20/2001 11:51:48 AM
BLD01-00725 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PASS
wip 8/20/2001 11:47:18 AM
BLD01-01236 BLD-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PASS
wip 8/20/2001 11:54:13 AM
MIS01-00107 MIS-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PASS
wip 8/20/2001 12:20:24 PM
MIS01-00090 MIS-Aging Inspection8/20/20018/20/20018/20/2001 12:00:00 AM PART
wip 8/20/2001 12:24:39 PM
MIS01-00139 BLD-Conference8/2/20018/20/20018/20/2001 12:00:00 AMAPART
Scheduled by Inspector: 415 On 8/2/2001 10:47:43 AM check to see if any work is being done, visual only, bad dogs
swo was placed again last time out 8/20/2001 11:58:20 AM
BLD01-01990 BLD-Footing8/17/20018/20/20018/20/2001 12:00:00 AMAPART
Clay ###-####
basment ftgs, verbal corrections 8/20/2001 11:38:27 AM
BLD01-01691 BLD-Foundation8/17/20018/20/20018/20/2001 12:00:00 AMAPART
###-#### jared
wip, verbal corrections on horizontal bar, may need ltr from eng. 8/20/2001 1:14:48 PM
BLD00-03185 BLD-Other8/17/20018/20/20018/20/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/17/2001 at 17:59:49. Contact: ###-####. met w/ Joe Tawney to go over job,
I had to leave to go to other jobs 8/20/2001 11:44:54 AM
BLD01-01372 BLD-Conference8/17/20018/20/20018/20/2001 12:00:00 AMAPART
firewall and floor ?s 8/19/2001 11:01:05 PM
will need arch. approval on floor, firewall per plan. 8/20/2001 10:14:15 AM
BLD00-01937 BLD-Wall cover8/18/20018/20/20018/20/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/18/2001 at 13:10:37. Contact: ###-####.
ext. shear ok 8/20/2001 4:00:59 PM
BLD01-00747 BLD-Other8/20/20018/20/20018/20/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/20/2001 at 07:50:39. Contact: ###-####.
int. masonary wall 1st lift, verbal corrections, pending s. i. report 8/20/2001 4:16:03 PM
BLD01-02212 BLD-Footing8/20/20018/20/20018/20/2001 12:00:00 AMPPART
ANOTHONY ###-####- FT
wip, verbal corrections 8/20/2001 1:15:22 PM
BLD01-01536 BLD-Framing/Rough-in8/20/20018/20/20018/20/2001 12:00:00 AMPPART
###-#### joe
ext. shear ok w/ verbal corrections/// need to add drywall shear to inside due to some ext. could not be verified w/ siding on 8/20/2001 4:13:43 PM