PLM02-02564
| Plumbing Rough-in | 8/19/2002 | 8/20/2002 | 8/20/2002 12:00:00 AM | A | PASS |
|
|
###-#### jan set trim on existing r/i, final ok with shower trim and calking on lavs in master bath ok. 8/20/2002 9:42:10 AM
|
PLM02-01417
| Final | 8/20/2002 | 8/20/2002 | 8/20/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 07:26:52. Contact: ###-####.
|
PLM02-02570
| Sprinkler (Final) | 8/20/2002 | 8/20/2002 | 8/20/2002 12:00:00 AM | P | PASS |
|
|
###-#### DOUGLAS
|
PLM02-01984
| Final | 8/20/2002 | 8/20/2002 | 8/20/2002 12:00:00 AM | P | PASS |
|
|
###-#### kevin
|