FIR03-00198
| FIR-Aging Inspection | 8/20/2003 | 8/20/2003 | 8/20/2003 12:00:00 AM | | PASS |
|
|
talked to Brad and he said that SLRMC should be giving the go ahead to proceed in October/November time frame 8/21/2003 9:21:10 AM
|
BLD02-00090
| FIRE-Conference | 8/19/2003 | 8/20/2003 | 8/20/2003 12:00:00 AM | A | PART |
|
|
met with Dave Hannah, John Shed, JP and subs about final requirements for occupancy. John Shed will provide checklist for final sign off 8/20/2003 10:43:50 AM
|
FIR03-00334
| INSP-Final Inspection | 8/19/2003 | 8/20/2003 | 8/20/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/19/2003 at 3:49:19 PM. Contact: ###-####.
|
BLD02-03091
| FIRE-Final Inspection | 8/20/2003 | 8/20/2003 | 8/20/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/20/2003 at 7:15:30 AM. Contact: ###-####. need fire pump data and jockey/fire pump controller test lines to drain; fire pump couldn't pump to 150 percent capacity as the suction was at zero 8/20/2003 4:13:27 PM
|
FIR03-00426
| INSP-Sprinkler Rough-in/Hydro | 8/20/2003 | 8/20/2003 | 8/20/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/20/2003 at 9:39:21 AM. Contact: ###-####. okay to cover main hallway from main entrance to stair; still need some openings firestopped that lead to void area 8/20/2003 2:00:33 PM
|
BLD03-00731
| FIRE-Final Inspection | 8/20/2003 | 8/20/2003 | 8/20/2003 12:00:00 AM | P | FAIL |
|
|
###-#### ext 11 rob needs fire extinguisher - left correction notice at reception 8/20/2003 4:14:10 PM 8/20/2003 4:14:41 PM
|
BLD02-02805
| FIRE-Final Inspection | 8/20/2003 | 8/20/2003 | 8/20/2003 12:00:00 AM | P | FAIL |
|
|
###-#### ext 11 rob needs fire extinguisher - left correction notice at reception 8/20/2003 4:14:32 PM
|