ESC04-00719
| Site Preparation | 8/19/2004 | 8/20/2004 | 8/20/2004 12:00:00 AM | A | PART |
|
|
Cole K. ###-#### silt fence should assist in preventing erosion of soils. Need additional bmp at front of driveway. Sweep daily or as needed and inspect, maintain bmp's. 8/20/2004 8:25:25 AM
|
ESC04-00277
| BMP Violation | 8/20/2004 | 8/20/2004 | 8/20/2004 12:00:00 AM | A | PART |
|
|
|
ESC04-00293
| Tracking Control | 8/20/2004 | 8/20/2004 | 8/20/2004 12:00:00 AM | A | PART |
|
|
Correction to rp--sweep street, curb and sidewalk. Fill out stormwater sign. 8/20/2004 8:29:49 AM
|
ESC04-00090
| BMP Violation | 8/20/2004 | 8/20/2004 | 8/20/2004 12:00:00 AM | A | FAIL |
|
|
Dave powell rp ###-####: Correction to rp. Will follow up next week. Complete by the end of the weekend. 8/20/2004 9:16:22 AM
|
ESC03-01557
| Site Preparation | 8/20/2004 | 8/20/2004 | 8/20/2004 12:00:00 AM | A | PART |
|
|
left phone message for rp M. Priest and WR Gann. Discussed with contractor regarding BMP's located along creek which needs maintain. With forcasted rain this weekend this maintain is needed to prevent discharging of sediment from occurring. Will Follow up. 8/23/2004 12:35:59 PM
|
ESC03-01028
| BMP Violation | 8/20/2004 | 8/20/2004 | 8/20/2004 12:00:00 AM | P | PART |
|
|
Correction to RP--Cleanup trash from job site, maintain d.inlet, sweep as needed. 8/20/2004 1:29:03 PM
|
ESC03-01029
| BMP Violation | 8/20/2004 | 8/20/2004 | 8/20/2004 12:00:00 AM | P | PART |
|
|
Correction to contractor--Clean up job site, maintain d.inlet, and sweep as needed. 8/20/2004 1:28:20 PM
|