Inspections for the day of: Friday, August 20, 2004.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-00791 FIRE-Final Inspection8/19/20048/20/20048/20/2004 12:00:00 AMAPART
A temporary occupancy was given with Dave Millers permission until the fire alarm plans have been resubmitted and job re-inspected. I inspected the life safety items and everything is ok except for three emergency lights that did not function. See approved plans for locations. Per the school maintenance people an electrician was on the way to repair them. 8/20/2004 1:44:07 PM
BLD04-00210 FIRE-Conference8/19/20048/20/20048/20/2004 12:00:00 AMAPASS
fire life safety finaled 8/20/2004 8:48:11 AM
BLD04-01104 FIRE-Final Inspection8/19/20048/20/20048/20/2004 12:00:00 AMAFAIL
Tested the first smoke detector and the strobes did not operate. All devices to be tested when strobes ae fixed. When fire alarms are finaled the life safety items are ok to sign off. 8/20/2004 10:36:04 AM
BLD04-01104 FIRE-Alarm Testing8/19/20048/20/20048/20/2004 12:00:00 AMAFAIL
tested the first smoke detector and the strobes did not operate. All devices to be tested when strobes ae fixed. 8/20/2004 10:34:34 AM
BLD04-00873 FIRE-Final Inspection8/19/20048/20/20048/20/2004 12:00:00 AMAPASS
Fire life safety finaled 8/20/2004 10:58:10 AM
FIR04-00377 INSP-Final Inspection8/18/20048/20/20048/20/2004 12:00:00 AMACANC
Stopped at project. Contractor not ready to go until next week. 8/20/2004 8:20:21 AM
FIR04-00364 INSP-Final Inspection8/20/20048/20/20048/20/2004 12:00:00 AMAPART
A temporary occupancy was given with Dave Millers permission until the fire alarm plans have been resubmitted and the project inspected. 8/20/2004 1:44:47 PM
FIR04-00464 INSP-Final Inspection8/20/20048/20/20048/20/2004 12:00:00 AMAFAIL
tested the first smoke detector and the strobes did not operate. All devices to be tested when strobes ae fixed.
FIR04-00471 INSP-Final Inspection8/20/20048/20/20048/20/2004 12:00:00 AMAPASS
fire sprinklers finaled
FIR03-00525 INSP-Final Inspection8/20/20048/20/20048/20/2004 12:00:00 AMPPASS
Fire sprinkler finaled
FIR04-00418 INSP-Final Inspection8/20/20048/20/20048/20/2004 12:00:00 AMPCANC
Fire alarm inspection not done due to bad board in fire alarm panel
FIR04-00489 INSP-Sprinkler Rough-in/Hydro8/20/20048/20/20048/20/2004 12:00:00 AMPPASS
fire sprinkler piping is ok to cover 8/20/2004 3:59:56 PM
BLD04-01145 FIRE-Final Inspection8/19/20048/20/20048/20/2004 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 8/19/2004 at 4:47:40 PM. Contact: ###-####.
BLD04-01145 FIRE-Alarm Testing8/19/20048/20/20048/20/2004 12:00:00 AMPCANC
Fire alarm inspection not done due to bad board in fire alarm panel 8/20/2004 3:54:21 PM
FIR04-00236 INSP-Sprinkler Rough-in8/19/20048/20/20048/19/2004 4:28:37 PMPCANC
Contact: Nate; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley