ELE08-01647
| Final | 8/20/2008 | 8/20/2008 | 8/20/2008 3:58:30 PM | P | PASS |
|
|
jim Phone #: ###-#### ok to final signed occupancy card, no esc this project
|
ESC07-01472
| General Inspection | 8/20/2008 | 8/20/2008 | 8/20/2008 3:15:30 PM | P | PART |
|
|
looked ok
|
ESC08-00480
| General Inspection | 8/20/2008 | 8/20/2008 | 8/20/2008 3:13:25 PM | P | PART |
|
|
looked ok
|
ELE08-02244
| Rough-In Permanent Service | 8/20/2008 | 8/20/2008 | 8/20/2008 2:47:51 PM | P | PASS |
|
|
Alan Phone #: ###-#### ri ok, left survey, called contractor, BCC 4-05-33(A),(B) sprinkler control shall be listed by a nationally recognized testing laboratory, p/s u/g n ok
|
ELE08-01648
| Final | 8/20/2008 | 8/20/2008 | 8/20/2008 1:37:35 PM | P | PASS |
|
|
jim Phone #: ###-#### ok to final, signed occupancy card, no esc this project
|
ELE08-02208
| Electrical Rough-In | 8/19/2008 | 8/20/2008 | 8/20/2008 12:39:24 PM | P | CANC |
|
|
Dale Phone #: ###-#### see conference
|
ELE08-02208
| Conference | 8/20/2008 | 8/20/2008 | 8/20/2008 12:38:49 PM | P | DONE |
|
|
Dale Phone #: ###-#### talked with electrical contractor about being ready for inspection, doing in parts for u/g because of depth and sluff box, conduit spacers side by side and top cover row, meters at transformer, but contractor doing work up to disconnects inside building, so city will inspect, general calling in inspections, so electrical contractor will have to co-ordinate when inspection to be requested
|
ELE08-02318
| Rough-In Permanent Service | 8/19/2008 | 8/20/2008 | 8/20/2008 10:31:33 AM | A | PASS |
|
|
#80689,Q#8231AXK. WIRED A NEW POWER PEDESTAL & NEW PHONE CABINET FOR QWEST. BRIAN ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell p/s u/g n ok, no esc this project
|
ELE08-02323
| Final | 8/19/2008 | 8/20/2008 | 8/20/2008 10:05:31 AM | A | FAIL |
|
|
WAYNE nOTE: PLEASE CALL 1/2 HR PRIOR TO INSPECTION Phone #: ###-#### met electrician, left correction notice, NEC 400.8 flexible cord shall not be used as a substitute for fixed wiring or where subject to physical damage,110.3 and BCC 4-05-33(A)&(B) all equipment shall be listed by a nationally recognized testing laboratory, NOTE: cottections shall be made within 10 days or further action will be taken such as removal of power
|
ELE08-01848
| Electrical Rough-In | 8/19/2008 | 8/20/2008 | 8/20/2008 9:08:09 AM | A | PART |
|
|
luke - sitting room at baby gap - ceiling Phone #: ###-#### ok cover ceiling kids sitting room and baby ceilings, no esc this project
|
ELE08-02317
| Rough-In Permanent Service | 8/19/2008 | 8/20/2008 | 8/20/2008 8:32:45 AM | A | PASS |
|
|
#80691,Q#8231AWR. Wired a new power pedestal & phone cabinet for QWEST. James ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell p/s u/g n ok, no esc this project
|
ELE08-00459
| Permanent Service | 8/19/2008 | 8/20/2008 | 8/20/2008 8:04:06 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/19/2008 at 11:47:47 AM. Contact: ###-####. called, left correction notice, NEC 404.8 center of grip of operating handle shall not be over 6'-7" above floor, 110.22 disconnects shall be labelled to indicate its purpose and be of sufficient durability to withstand its environment, 250.68 connection to grounding electrode shall be accessible, 358.30(A) shall strap emt within 3' of box,250.52 shall provide concrete encased electrode, BCC shall provide separate electrical permit for 2nd meter
|