FIR09-00033
| INSP-Sprinkler Rough-in | 8/14/2009 | 8/20/2009 | 8/21/2009 8:03:36 AM | P | PART |
|
|
Walkthrough completed for systems 14 and 31-see inspection notes for FIR09-00363, also finished sprinkler monitoring tests with the exception of preaction system low air signals/ solenoid operation. Pressure switch at system 27 needs replaced, noted new sprinkler line below overhead pallet storage east dock area, corrections at the dry goods warehouse not yet completed.
|
FIR09-00033
| INSP-Alarm Testing | 8/20/2009 | 8/20/2009 | 8/21/2009 7:52:38 AM | P | PART |
|
|
The remainder of riser supervision at systems in rooms #4 and #5 tested with the exception of low air signals monitored by a separate panel not ready for testing. Pressure switch at system 27 is still not functional and failed to initiate an alarm condition upon waterflow.
|
FIR09-00363
| INSP-Final Inspection | 8/20/2009 | 8/20/2009 | 8/21/2009 7:46:07 AM | P | PART |
|
|
Reinspection for C/N item at system 31 perishables office passed, noted items at system 14 main office include missing ceiling tiles and escutcheons at some locations, new shelving installed at the "scan room" blocks coverage and may affect room hazard classification, two locations above the office exit doors south side are lacking coverage as the adjacent upright heads in the shift exchange are blocked by an elevation change.
|
FIR08-00766
| INSP-Final Inspection | 8/20/2009 | 8/20/2009 | 8/21/2009 7:31:10 AM | P | PASS |
|
|
Underground fire supply line permit work approved for final status.
|
FIR09-00487
| INSP-Final Inspection | 8/20/2009 | 8/20/2009 | 8/21/2009 7:28:07 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/20/2009 at 7:42:37 AM. Contact: ###-####. Rescheduled per phone call from contractor for 8/21.
|
FIR08-00775
| INSP-Final Inspection | 8/14/2009 | 8/20/2009 | 8/21/2009 7:27:18 AM | A | PASS |
|
|
The remainder of fire alarm system testing passed per inspection by S. Cobbley, fire alarm permit approved for final.
|
FIR09-00164
| INSP-Sprinkler Rough-in/Hydro | 8/19/2009 | 8/20/2009 | 8/21/2009 7:24:46 AM | A | PART |
|
|
Overhead hydrostatic test for the new dry system above the band room passed, noted air compressor serving this system to be hard wired, upright at the valve room is obstructed.
|