Inspections for the day of: Thursday, August 20, 2009.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00499 Site Preparation8/20/20098/20/20098/21/2009 7:16:11 AMPPASS
ESC09-00437 General Inspection8/20/20098/20/20098/20/2009 4:17:17 PMPPASS
BLD09-01168 BLD-Energy code compliance8/19/20098/20/20098/20/2009 4:09:12 PMPPART
p.j. Phone #: ###-####
not reqd
ESC09-00436 General Inspection8/20/20098/20/20098/20/2009 4:04:16 PMPPASS
BLD07-01846 BLD-Framing/Rough-in8/20/20098/20/20098/20/2009 3:18:09 PMPNR
Ben Phone #: ###-####
need elec 1st
BLD09-01316 BLD-Energy code compliance8/20/20098/20/20098/20/2009 3:15:09 PMPPASS
aaron - please call for access Phone #: ###-####
house ok
BLD09-01316 BLD-Framing/Rough-in8/20/20098/20/20098/20/2009 3:14:07 PMPPART
Aaron Phone #: ###-####
house ok,, not carport
BLD09-00296 BLD-Wall cover8/19/20098/20/20098/20/2009 2:57:04 PMPPART
Scheduled by a contractor via Hello! on 8/19/2009 at 6:14:46 PM. Contact: ###-####.
need some fire blocks in furred out wall tops
BLD09-00660 BLD-Final8/20/20098/20/20098/20/2009 2:31:39 PMPPASS
Chuck Phone #: ###-####
BLD09-00660 DOC - Permit Finaled8/20/20098/20/20098/20/2009 2:31:33 PMPPASS
signed parer work
BLD09-00363 BLD-Final8/19/20098/20/20098/20/2009 2:18:46 PMANR
Russ Phone #: ###-####
not ready,, need zoning 1st
BLD09-00076 BLD-Framing/Rough-in8/20/20098/20/20098/20/2009 2:04:33 PMPPART
Chris Phone #: ###-#### Please call 15 min before going out
on site conf. need a stamp on struct eng letter,, need electrical to look at one more time before cover,, fire blocks as needed
BLD09-01378 BLD-Final8/19/20098/20/20098/20/2009 12:00:36 PMADONE
John Phone #: ###-####
BLD09-01378 DOC - Permit Finaled8/20/20098/20/20098/20/2009 12:00:17 PMPPASS
done
BLD09-01332 BLD-Footing8/19/20098/20/20098/20/2009 11:54:02 AMAPASS
Scheduled by a contractor via Hello! on 8/19/2009 at 6:26:04 PM. Contact: ###-####.
mono pour ok
BLD09-01332 BLD-Foundation8/19/20098/20/20098/20/2009 11:53:16 AMAPASS
Scheduled by a contractor via Hello! on 8/19/2009 at 6:25:25 PM. Contact: ###-####.
mono pour ok
BLD09-01351 BLD-Footing8/19/20098/20/20098/20/2009 11:46:25 AMANR
todd Phone #: ###-####
BLD09-01346 BLD-Footing8/18/20098/20/20098/20/2009 11:45:55 AMANR
Pat Phone #: ###-####
BLD09-01345 BLD-Footing8/19/20098/20/20098/20/2009 11:45:35 AMANR
todd Phone #: ###-####
BLD09-01168 BLD-Framing/Rough-in8/19/20098/20/20098/20/2009 10:01:29 AMAPASS
p.j. Phone #: ###-####
BLD09-01106 BLD-Foundation8/19/20098/20/20098/20/2009 9:04:58 AMAPASS
Hueth Phone #: ###-####
BLD09-00493 BLD-Conference8/20/20098/20/20098/20/2009 12:00:00 AMAPART
Tony Young and I met Don and Sherry (owners) on site to discuss current project status and their concerns on the patio addition. They informed us that the project had been stopped at their request until issues between them and contractor had been resolved. Many civil issues need to be addressed between them and their contractor that are beyond Boise City's responsibility. Tony and I reviwed the current status of the addition to the approved plans and to comments provided by a outside engineer. It was recommended that the new engineer provide with his report supporting calculations as to why members/connections were not adequate and options for repair, specifically the footings supporting the floor and roof loads which was also requested on inspections performed 7/7/09. I also informed owners that I would request by letter to the contractor to provide this information as originally requested. I also informed the owners to send me any further questions by email and that I would address them as well.
BLD09-00296 BLD-Wall cover8/19/20098/20/20098/19/2009 6:13:18 PMACANC
Scheduled by a contractor via Hello! on 8/19/2009 at 4:27:43 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 19 2009 6:13PM.
BLD09-00296 BLD-Energy code compliance8/19/20098/20/20098/19/2009 4:28:56 PMACANC
Scheduled by a contractor via Hello! on 8/19/2009 at 4:22:59 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 19 2009 4:28PM.