Inspections for the day of: Thursday, August 20, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00293 DOC - Permit Finaled8/20/20098/20/20098/20/2009 2:59:17 PMPPASS
ESC07-00523 Aging Inspection8/20/20098/20/20098/20/2009 2:15:22 PM DONE
finaled permit
ESC07-00523 DOC - Permit Finaled8/20/20098/20/20098/20/2009 2:09:38 PMPPASS
ESC09-00359 Site Preparation8/19/20098/20/20098/20/2009 1:55:03 PMAPART
Need to post signage for washout after being constructed.
ESC09-00519 Tracking Control8/20/20098/20/20098/20/2009 11:01:36 AMACANC
ESC09-00515 Site Preparation8/20/20098/20/20098/20/2009 11:00:47 AM PASS
ESC08-00666 General Inspection8/20/20098/20/20098/20/2009 9:57:39 AM DONE
Finaled Permit.
ESC08-00666 DOC - Permit Finaled8/20/20098/20/20098/20/2009 9:57:15 AMPPASS
All work complete.
ESC08-00675 General Inspection8/20/20098/20/20098/20/2009 9:56:26 AM DONE
No activity
ESC08-00638 General Inspection8/20/20098/20/20098/20/2009 9:55:36 AM PASS
ESC09-00216 DOC - Permit Finaled8/20/20098/20/20098/20/2009 9:54:35 AMPPASS
ESC08-00491 BMP Violation8/20/20098/20/20098/20/2009 9:38:16 AMAPART
Message to RP:
Remove silt fence within the storm channel flow. Informed him that barrier are not allowed within concerated flow channels. Will evolve into more serious issues.
ESC09-00519 Site Preparation8/20/20098/20/20098/20/2009 9:00:34 AM FAIL
Verbal to RP:
Clean up all tracking onto Gowen Rd from project area. WIll re-inspect 08/21/09AM