Inspections for the day of: Friday, August 20, 2010.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-01075 FIRE-Final Inspection8/17/20108/20/20108/20/2010 3:37:56 PMAPASS
Life safety passed. At the first inspection I found that the exit discharge lights had been run through a photo cell which is not allowed. The lights had been removed from the photo cells at my second visit and functioned correctly.
FIR10-00157 INSP-Final Inspection8/19/20108/20/20108/20/2010 3:28:40 PMPPASS
Permit finaled. The netcon was a 5
FIR10-00331 INSP-Final Inspection8/20/20108/20/20108/20/2010 2:45:13 PMPPASS
Permit finaled
FIR10-00318 INSP-Final Inspection8/19/20108/20/20108/20/2010 2:42:26 PMPPASS
Permit finaled. Netcon was a 5.
FIR10-00342 INSP-Supply line flush8/19/20108/20/20108/20/2010 2:36:16 PMPFAIL
United water didnt unlock the valve again. No flushing performed.
FIR10-00403 INSP-Sprinkler Rough-in8/19/20108/20/20108/20/2010 10:52:17 AMAPASS
Sprinkler piping is ok to cover.
FIR10-00099 INSP-Final Inspection8/18/20108/20/20108/20/2010 10:44:28 AMAPASS
Permit finaled. The netcon was a 5
BLD10-01645 FIRE-Final Inspection8/20/20108/20/20108/20/2010 9:19:00 AMPPASS
Life safety passed. I notified Glenn with Darigold that if the new racking that was stacked out in the parking lot was to be installed inside new plans would be required.
FIR10-00360 INSP-Final Inspection8/19/20108/20/20108/20/2010 9:15:46 AMAPASS
Permit finaled
FIR10-00262 INSP-Final Inspection8/19/20108/20/20108/20/2010 9:15:18 AMAPASS
Permit finaled