FIR13-00315
| INSP-Sprinkler Rough-in/Hydro | 8/20/2013 | 8/20/2013 | 8/21/2013 4:12:55 PM | P | PART |
|
|
UG fire supply line okayed for cover as discussed.
|
FIR13-00416
| INSP-Final Inspection | 8/20/2013 | 8/20/2013 | 8/21/2013 4:11:24 PM | P | PASS |
|
|
Scope of work finished. Fire sprinkler permit finaled.
|
FIR13-00416
| INSP-Sprinkler Rough-in | 8/20/2013 | 8/20/2013 | 8/21/2013 4:10:01 PM | P | PART |
|
|
Overhead rough-in okayed.
|
FIR13-00332
| INSP-Sprinkler Rough-in | 8/19/2013 | 8/20/2013 | 8/20/2013 11:17:24 AM | A | PART |
|
|
OH work at the pharmacy drop ceilings finished.
|
FIR13-00269
| INSP-Sprinkler Rough-in | 8/19/2013 | 8/20/2013 | 8/20/2013 11:16:08 AM | A | PART |
|
|
Remainder of rough-in work completed at the deli and bakery freezer areas.
|
BLD13-01511
| FIRE-Final Inspection | 8/19/2013 | 8/20/2013 | 8/20/2013 10:00:07 AM | A | PASS |
|
|
Fire life safety okay provided "door to remain..." signage is posted at the main entry/exit. To be done prior to structural final as agreed.
|
BLD13-01477
| FIRE-Final Inspection | 8/19/2013 | 8/20/2013 | 8/20/2013 9:58:12 AM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|