Inspections for the day of: Wednesday, August 20, 2014.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00292 General Inspection8/20/20148/20/20148/20/2014 11:45:19 AM PASS
WIP. No sediment or discharge violations. No hillside erosion areas developing. No corrections necessary at this time.
ESC14-00289 General Inspection8/20/20148/20/20148/20/2014 11:42:15 AM PASS
Permit posted. Downslope vegetative area has been preserved. No rill erosion has formed and limits of disturbance are containing loosed dirt.

No corrections required at this time.
ESC14-00284 General Inspection8/20/20148/20/20148/20/2014 11:36:00 AM PASS
WIP. Perimeter vegetative barrier has been preserved. No hillside erosion or sediment accumulation in gutters observed. Approved.
ESC14-00697 Site Preparation8/20/20148/20/20148/20/2014 11:34:45 AMPPASS
Inspection so we can begin excavation. Thank you Phone #: ###-#### >> Inspection requested via web by Joshua Edwards


Site is ready for excavation. Mill District Square BMPs are in good condition and contractors working to minimize trackout and other ESC issues. Approved.
ESC13-01047 Aging Inspection8/20/20148/20/20148/20/2014 11:08:23 AM PASS
Foundation is poured. Work on frame has yet to begin. No violations.
ESC14-00300 General Inspection8/20/20148/20/20148/20/2014 10:38:06 AM PASS
WIP on collision center addition. Drainage features have filter protection and existing hard surfaces have been preserved. Concrete washout facility located at south end of Auto Drive. No trackout, dust, or other issues. Approved.
ESC14-00200 General Inspection8/20/20148/20/20148/20/2014 10:23:50 AM PASS
Frame for Involta data center is being built. Site utilities and permanent stormwater controls have been installed.

Construction entrance on Victory View has been removed and graded to prep for paving of parking lots and access drive. Minimal trackout to street, stormdrains have inlet protection.

No dust issues at time of inspection, perimeter silt fence is in good condition, and signage was posted on entrance off Maple Grove to keep dust from traffic down.

Site is currently in compliance.
ESC14-00718 DOC - Permit Finaled8/20/20148/20/20148/20/2014 10:01:35 AMAPASS
Existing house was demolished and site preped for future activity. This phase is now complete and the project is covered under ESC14-00700.

No ESC violations observed at time of inspection.
ESC14-00700 Site Preparation8/19/20148/20/20148/20/2014 10:00:12 AMAPASS
Kevin Phone #: ###-####

RP Kevin from ESI onsite. Previous grading and demo of old home was completed under ESC14-00718. This permit is now finaled and grading for drainage & utilities is occuring.

BMPs include diversion channel for irrigation around set, irrigation point discharge pipe has a settlement pond for suspended sediment. The wire backed fence at west end of site is trenhed.

Currently design of site directs all sheet flow towards center of lot. Water truck is onsite to control fugitive dust as needed.

Approved. Note - site is to have multiple buildings and new parcels therefore there are multiple BLD and ESC permits.
ESC13-01076 DOC - Permit Finaled8/20/20148/20/20148/20/2014 9:09:15 AMPPASS
ESC13-01076 Aging Inspection8/20/20148/20/20148/20/2014 9:08:52 AM PASS
ESC conditions all satisfied. Construction complete. All other permits finaled.
ESC13-01075 Aging Inspection8/20/20148/20/20148/20/2014 9:05:18 AM PASS
Finaled.
ESC13-01075 DOC - Permit Finaled8/20/20148/20/20148/20/2014 9:04:54 AMPPASS
Project complete, landscaped, and occupied. ESC condtions satisfied.