ESC14-00296
| General Inspection | 8/20/2014 | 8/20/2014 | 8/20/2014 1:01:34 PM | | PASS |
|
|
|
ESC13-00919
| Aging Inspection | 8/20/2014 | 8/20/2014 | 8/20/2014 12:30:15 PM | | PASS |
|
|
no issues at this time
|
ESC14-00303
| General Inspection | 8/20/2014 | 8/20/2014 | 8/20/2014 11:03:03 AM | | PART |
|
|
hillside erosion taking place from lack of vegetation re-establishment practices. Disturbed areas need to be hydro-seeded or tacked w/ seed
|
ESC11-00192
| General Inspection | 8/20/2014 | 8/20/2014 | 8/20/2014 10:47:55 AM | | PASS |
|
|
vegetation growing in good. No ESC Issues at this time
|
ESC13-00994
| Aging Inspection | 8/20/2014 | 8/20/2014 | 8/20/2014 10:13:24 AM | | PASS |
|
|
|
ESC14-00261
| General Inspection | 8/20/2014 | 8/20/2014 | 8/20/2014 9:43:24 AM | | PASS |
|
|
some sediment in street, but nothing major. contractor was seen hand sweeping roads
|
ESC13-00592
| Site Preparation | 8/19/2014 | 8/20/2014 | 8/20/2014 9:03:14 AM | A | PASS |
|
|
Byion Phone #: ###-#### Silt fence, permit and ESC Plan Posted onsite along Denton St. Some of the silt fence is installed incorrectly, but RP stated they wont work near fencing, if they do they will re-install correctly. Concrete washout will be installed in 2 weeks when they get ready to pour. pass
|